    ENGIE Signs Partnership with Hannon Armstrong for 2.3 GW Renewables Portfolio in the US

    ENGIE announced the signing of an agreement to sell 49% equity interest in a 2.3 GW US renewables portfolio to Hannon Armstrong, a leading investor in climate change solutions. ENGIE will retain a controlling share in the portfolio and continue to manage the assets. On commissioning, this 2.3 gigawatts portfolio that comprises 1.8 GW of onshore wind and 0.5GW of solar photovoltaic projects, will represent a major milestone in achieving ENGIE’s goal of commissioning 9 GW additional renewable capacity by 2021.

    Under the agreement, Hannon Armstrong will take immediate ownership of 49% of 663 megawatts of commissioned wind projects. The remaining 1.6 GW of projects, currently under construction, will be transferred into the partnership upon commissioning. In line with its majority ownership, ENGIE will continue to consolidate the projects in its accounts.

    The portfolio comprises 13 projects, 9 onshore wind projects and 4 solar, located in key markets in the United States, including the Electric Reliability Council of Texas, Midcontinent Independent System Operato, PJM Interconnection, the Southwest Power Pool and PJM Interconnection

    Source : Strategic Research Institute
  2. forum rang 10 voda 9 juli 2020 14:19
    Meer schepen Fugro naar Amerikaans windproject

    (ABM FN-Dow Jones) Fugro heeft twee extra schepen ingezet voor werkzaamheden voor een windpark voor de Amerikaanse oostkust. Dat maakte de bodemonderzoeker donderdag bekend.

    Het Atlantic Shores windpark voor de kust van New Jersey is een gezamenlijk project van Royal Dutch Shell en EDF.

    Fugro is sinds mei actief in het gebied en heeft er nu drie vaartuigen aan het werk. Later deze maand volgt een vierde schip.

    De werkzaamheden betreffen de verzameling van geofysische, geotechnische en andere data op de locatie van het windpark en langs twee mogelijke routes voor de stroomkabels.

    Door: ABM Financial News.
    info@abmfn.nl
    Redactie: +31(0)20 26 28 999

    © Copyright ABM Financial News B.V. All rights reserved.
  3. Joni-2 13 juli 2020 12:32
    Ørsted kondigde op 10 juli, dat het uit milieu overweging, op zoek gaat voor een andere locatie, voor haar interconnectie-site voor de Skipjack Wind Farm in Fenwick Island State Park.

    De oplevering van het windpark is nu voorzien voor 2023

    www.capegazette.com/article/%C3%B8rst...

    www.offshorewind.biz/2020/07/13/orste...
  4. Joni-2 15 juli 2020 11:43
    Forbes.com

    De offshore windprojecten die op stapel staan voor 2030, nabij de oostkust van de USA, hebben de capaciteit van 15 kerncentrales.

    Een handvol grote bedrijven, waaronder Europese bedrijven zoals het Deense Orsted en het Noorse Equinor, zullen tegen het einde van het decennium ongeveer $ 70 miljard uitgeven aan offshore wind langs de oostkust en banen bieden aan 40.000 mensen, volgens een analyse van 2019 door het Special Initiative voor Offshore Wind (SIOW), een onafhankelijke eenheid van het College of Earth, Ocean and Environment van de University of Delaware.

    www.forbes.com/sites/scottcarpenter/2...
  5. forum rang 10 voda 29 juli 2020 15:57
    Geronimo Energy Green River Wind Farm in Illinois

    Geronimo Energy, alongside power purchasers and community members, celebrated today the economic and social benefits from the operational 194 megawatt Green River Wind Farm. Green River, located in Lee and Whiteside Counties in Illinois within the PJM Regional Transmission Operator system, began major onsite construction activities in June 2018 and entered operations at the end of 2019. Green River has Virtual Power Purchase Agreements with Apple, Akamai Technologies, and Swiss Re, as well as a Power Purchase Agreement with Illinois Municipal Electric Agency. Akamai, Etsy and Swiss Re previously had limited opportunity to access large renewable energy projects in the regions covered by the thirteen state PJM wholesale electric market. By collaborating with Apple, these companies were able to access wind and solar power from the new projects at competitive prices and agreement terms. Collaborations like this accelerate the pace at which new renewable energy generation is built and brought online.

    3Degrees facilitated the renewable energy aggregation with the corporate power purchasers. The project was built by Mortenson and utilizes Siemens Gamesa wind turbines. It was developed and is operated by Geronimo Energy.

    The project employed approximately 200 construction workers at its peak and boosted local economies with increased local spending as a direct result of this influx of temporary workers. As an operating project, Green River has begun to provide positive long-term economic impacts to the local and state communities. The project has created 11 new full-time jobs at its Operations & Maintenance building located in Deer Grove, Illinois. Additionally, throughout the first 20 years of operations, Geronimo estimates the project will provide 35 million in new tax revenue and 20 million in landowner payments.

    Source : STRATEGIC RESEARCH INSTITUTE
  6. forum rang 10 voda 31 juli 2020 17:03
    Siemens Gamesa strengthens its position in Chile with new 60-MW project extension from EDF and Ibereólica

    Siemens Gamesa EDF Renewables Ibereólica RenovablesSiemens Gamesa Renewable Energy has received a new 60-MW order to extend the Cabo Leones 1 wind project in Chile, operated by the joint venture formed by the French utility EDF Renewables Chile and Spain’s Grupo Ibereólica Renovables. Under the terms of the agreement, Siemens Gamesa will supply, transport and install 12 of its SG 5.0-145 MW turbines for the Cabo Leones 1 extension wind complex at Comuna de Freirina, in the second region of the Atacama in Chile.

    Since 2017, Siemens Gamesa has successfully managed the Cabo Leones 1 wind project located on the coast in the Atacama region of Northern Chile – one of the best areas for wind resources. With a current installed capacity of 115 MW, the wind farm is equipped with 55 of Siemens Gamesa’s SG 2.1-114 MW turbines with an estimated energy production of 350 GWh per year, equaling the annual electricity consumption of 170,000 Chilean households.

    Among the Latin American countries, Chile’s renewable energy transition journey has been compelling. The Chilean government has pledged to generate 70 per cent of the country’s energy from renewable sources, such as solar power and wind farms, by 2050. Renewables, therefore, are expected to play a more prominent role in the energy mix in Chile.

    Siemens Gamesa will supply the turbines between November 2020 and January 2021. They are slated for commissioning by July 2021. The current Cabo Leones I extension also includes and operation & maintenance agreement for the next 12 years.

    Source : STRATEGIC RESEARCH INSTITUTE
  7. forum rang 10 voda 10 augustus 2020 15:57
    Mortenson Starts Wind Turbine Erection at PacifiCorp's Pryor Mountain Wind Project in Montana

    Mortenson announced that turbine erection work has started at PacifiCorp's 240 MW Pryor Mountain Wind Project located near Bridger in Montana. The project will consist of four GE turbines and 110 Vestas turbines totaling 240 MW of clean, renewable energy. PacifiCorp selected Mortenson in 2019 as the Balance of Plant contractor to construct the Pryor Mountain project. Mortenson's project team mobilized in Carbon County in March 2020. The scope of work includes public road improvements, creation of access roads to each turbine site, foundations, underground collection, substation, operations and maintenance building and met towers.

    Currently, the state has an installed wind capacity of 882 MW, with 240 MW under construction. Upon completion of Pryor Mountain, Mortenson will have constructed 76 percent of all wind energy in Montana.

    At peak construction, approximately 300 people will be employed on-site at Pryor Mountain. The project is estimated to be complete in December 2020. When completed, the site will power roughly 76,000 homes southeast of Bridger.

    Source : STRATEGIC RESEARCH INSTITUTE
  8. forum rang 10 voda 11 augustus 2020 12:15
    Vestas wins 54 MW Multibrand Service Agreement in the Philippines

    Vestas has secured an agreement with Vena Energy to service its 54 MW Gamesa turbines at Pililla Wind Project in Philippines. The agreement is Vestas’ first full scope multi-brand service deal in the country, leveraging our extensive experience from servicing 3.6 GW Gamesa turbines globally, including Taiwan in the Asia Pacific region. Located 50 kilometres east of the capital city, Manila, the Pililla Wind Project was commissioned in 2015 and comprises 27 Gamesa G90-2.0 MW turbines.

    Under the agreement, Vestas will commence a 5-year Active Output Management 5000 service agreement, designed to maximise the wind farm’s energy production. With a yield-based availability guarantee for turbines and services for balance of plant assets, the agreement will provide Vena Energy with improved certainty of return on its wind asset investment.

    Source : STRATEGIC RESEARCH INSTITUTE
  9. Joni-2 12 augustus 2020 10:39
    Orsted wint bod van de staat New York voor groot nieuw windpark bij Montauk (USA)

    Het Sunrise Wind-project werd voorgesteld door Ørsted US Offshore en Eversource, de bedrijven die nu Deepwater Wind bezitten, en de plannen voor het South Fork Windpark.

    Het Sunrise Wind-voorstel roept op om maar liefst 100 turbines te plaatsen in hetzelfde algemene deel van de oceaan als het veel kleinere South Fork Wind Farm, ongeveer 30 zeemijl ten zuidoosten van Montauk. De pitch van het bedrijf aan de staat zegt dat het verwacht dat het project tegen 2024 kan zijn gebouwd en operationeel kan zijn, slechts twee jaar nadat het South Fork-windpark online zou moeten komen.

    Ørsted en Eversource, die door de aankoop van Deepwater nu eigenaar zijn van de huurcontracten van meer dan 800 vierkante mijl zeebodem ten zuiden van New England. Ze hebben ook twee andere ontwikkelingsprojecten voor offshore windparken in de maak, met in totaal maar liefst 200 turbines, die stroom naar Rhode Island en Connecticut zullen sturen.

    Het Sunrise Wind-project zou ongeveer 800 megawatt aan stroom produceren voor Long Island. Het exacte aantal turbines kan variëren, afhankelijk van de grootte van de gebruikte turbines, en zal waarschijnlijk pas over een aantal jaren gereed zijn.

    www.27east.com/east-hampton-press/ors...
  10. Joni-2 14 augustus 2020 14:51
    RWE Renewables en Diamond Offshore Wind, eigendom van Mitsubishi, (MHI) hebben een nieuwe joint venture gevormd, bekend als New England Aqua Ventus, die het drijvende windproject met één turbine, dat naar verwachting $ 100 miljoen zal kosten, zal verwerven, ontwikkelen en uiteindelijk exploiteren.

    Dit alle in opdracht van de Universiteit van Maine (US)

    www.greentechmedia.com/articles/read/...

    MHI Vestas welke in Europa ook bezig is met drijvende windmolens, is niet betrokken
  11. forum rang 10 voda 18 augustus 2020 15:37
    Siemens Gamesa Securs 10 Year Service Deal for 2 Senvion Project Sites in US

    Siemens Gamesa Renewable Energy announces it has signed 10-year service agreements with an undisclosed customer at two sites in North America featuring Senvion MM92-2.05 turbines for a total of 184 MW. Both sites include service, maintenance and warranty agreements with an availability guarantee. As part of the deal, the company will provide remote monitoring, supply chain access and specialty tooling, design and engineering support, and software updates, while fully utilizing the existing hardware and infrastructure on site to ensure the performance and reliability of the turbines throughout the product lifetime.

    Since the acquisition of Senvion’s Onshore European service assets and Intellectual Property in early January 2020, the company has secured almost 1 GW of service agreements outside of the transaction perimeter in the US, Canada, Australia and Europe.

    Source : STRATEGIC RESEARCH INSTITUTE
  12. forum rang 10 voda 26 augustus 2020 16:50
    Enel Green Power Connects Motilla del Palancar Wind Farm to Grid in Cuenca

    Enel Green Power Spain has connected to the electricity grid a 51 MW wind farm in the town of Motilla del Palancar, in the Cuenca province. The investment associated with this project amounts to 51 million euros and it will reach an annual production of 144 GWh, avoiding the emissions of approximately 95,000 tonnes of CO2 per year. The development of this wind farm, made up of 17 wind turbines with a unit power of 3MW, has abided by Enel Green Power's "Sustainable Construction Site" model, which includes the installation of photovoltaic solar panels on each site to cover part of its waste separation energy needs and use of water storage tanks, among other things. Once the construction works are completed, both the photovoltaic panels and the water-saving equipment will be donated to the municipalities where the projects are located for public use.

    A wide range of innovative tools and techniques have been used to build this wind farm, such as drones for topographic surveying, smart tracking of turbine components, advanced digital platforms and software solutions for monitoring and remote support of various activities as well as the commissioning of the facility. These solutions allow accurate and reliable data on these activities to be gathered quickly, enhancing overall construction quality and facilitating communication between teams both on- and off-site.

    Source : STRATEGIC RESEARCH INSTITUTE
  13. forum rang 10 voda 28 augustus 2020 16:19
    Greentown Labs and Vineyard Wind Announce Offshore Wind Challenge Startup Participants

    Greentown Labs, the largest climatetech startup incubator in North America, and Vineyard Wind, developer of the first utility-scale offshore wind energy generation facility in the United States, have selected three startups for the Offshore Wind Challenge. The startups will focus on innovations in marine mammal monitoring through data collection, real-time transmission, and analysis. The advancement of their technologies will support the responsible development of the offshore wind industry off the coast of Massachusetts, and well beyond. The Challenge, run by Vineyard Wind and Greentown Labs with support from the Massachusetts Clean Energy Center, received more than 60 applications from around the globe. After a highly competitive recruitment and deliberation process, the partners announced that the following three companies have been selected to participate in the Offshore Wind Challenge and apply their technologies to near, real-time marine mammal detection:

    SICdrone, based in Massachusetts, builds offshore-capable aerial drone systems that can fly in harsh weather conditions, eliminating weather delays for critical inspection and monitoring at sea.

    Night Vision Technology Solutions, based in Rhode Island, is a high-technology provider of thermal and visible camera systems designed for offshore wind, search and rescue, threat detection, and situational awareness.

    Open Ocean Robotics, based in British Columbia, makes it cheaper, easier, and safer to understand our oceans using solar-powered, self-driving boats that travel oceans for months at a time while collecting ocean data.

    Based at Greentown Labs, which is headquartered in Somerville, Mass., the Offshore Wind Challenge is a six-month accelerator program focused on providing entrepreneurs with the connections, business and technical resources they need to commercialize their technologies. In addition to receiving direct support from Vineyard Wind and the Massachusetts Clean Energy Center, the Challenge also draws on the knowledge and expertise of the Woods Hole Oceanographic Institution (WHOI) and the New England Aquarium.

    All participants in the program will receive:

    Acceptance into Greentown Launch, a six-month partnerships acceleration program for startups, hosted at Greentown Labs, the largest climatetech incubator in North America

    A structured platform to explore potential partnership outcomes with Vineyard Wind

    Exclusive access to the Greentown Labs and Vineyard Wind networks

    Funding and access to MassCEC’s New Bedford Marine Commerce Terminal for ocean validation of technologies

    Greentown Labs membership for the duration of the six-month accelerator program

    Mentorship, networking opportunities, and partnership-focused programming from the Greentown Labs ecosystem of cleantech and climatetech startup experts

    Access to mentorship from the world’s leading offshore wind engineers, scientists, and permitting specialists

    Access to various offshore wind organizations and suppliers

    The Offshore Wind Challenge will feature over 40 hours of intensive business training, hands-on mentorship from industry experts, and a unique model of startup-and-corporate relationship building. The Offshore Wind Challenge partners will host a final showcase in 2021 to share startup progress, accomplishments, and successful results of working closely with Vineyard Wind, Greentown Labs, and MassCEC throughout the program.

    Source : STRATEGIC RESEARCH INSTITUTE
  14. forum rang 10 voda 1 september 2020 14:17
    Nordex to Deliver Wind Turbines to TODA Energia do Brasil

    Nordex Group has again received an order for AW132/3465 turbines from Brazil. For its new customer TODA Energia do Brasil, the manufacturer will supply eight turbines for a 27.7 MW wind farm. The project is located in the French developer Voltalia’s 2.4 GW Serra Branca wind and solar cluster in north-eastern Brazil. The order also includes the service of the turbines for 15 years. Construction is scheduled to start in March 2021. The infrastructure work and operation will be carried out by Voltalia for TODA Energia do Brasil. The Nordex Group will install the eight turbines on 120-metre concrete towers produced at its local plant in Areia Branca in Rio Grande do Norte. The project forms part of the 2.4 GW Serra Branca cluster to which the Nordex Group has already provided turbines with 341 MW.

    TODA Energia do Brasil is a subsidiary of the TODA Corporation, a Japanese company which has explored wide range of business fields including renewable energy, with operations in Japan, Brazil and regions of Southeast Asia as well as Africa.

    Source : STRATEGIC RESEARCH INSTITUTE
  15. forum rang 10 voda 2 september 2020 16:03
    Falck Renewables & Eni US to Acquire 62 MW of BEHUS Wind &Solar Projects in US

    Falck Renewables SpA and Eni New Energy US Inc, through Novis Renewables Holdings LLC, a partnership with 51% and 49% shares respectively, announce the signing of an agreement with Building Energy SpA to acquire Building Energy Holdings US LLC. BEHUS business consists of 62 MW of operating wind and solar projects in the US, a development and asset management team and a pipeline of wind projects up to 160 MW. A wholly owned subsidiary of Novis will acquire the equity of all the projects, the development assets, and the other activities of BEHUS upon the satisfaction of conditions precedent to the transaction for a total purchase price of $32.5 million that will be adjusted in line with market practice. The closing is foreseen by year end.

    BEHUS was founded by Building Energy SpA to develop wind and solar projects in the US in 2013. Novis will acquire five operating solar projects totaling 31.59 MW and a 30 MW wind project in Iowa all of which sell power under Power Purchase Agreements. Falck Renewables North America, Inc. will provide technical and administrative asset management on behalf of Novis to manage the newly acquired projects post-Closing of the transaction.

    Novis will also acquire the development and operations team and a wind and solar development pipeline of BEHUS. Specifically, two late stage up to 80 MW each wind development projects in the western United States.

    The generation for the assets in operations will contribute to offsetting over 93,000 tons of C02 per year.

    Source : STRATEGIC RESEARCH INSTITUTE
  16. forum rang 10 voda 3 september 2020 12:58
    Vestas Bags 409 MW Order for Ventos do Piauí in Brazil

    Vestas has received a 409 MW order from the joint venture between Votorantim Energia and the Canadian fund CPP Investments for the projects Ventos do Piauí II and Ventos do Piauí III in Serra do Inácio in the state of Piauí, in Brazil. The contract includes the supply and commissioning of V150-4.2 MW wind turbines, as well as a 20-year Active Output Management 5000 service agreements, designed to ensure optimised performance for the lifetime of the project. Turbine delivery will begin in the second half of 2021 with commissioning scheduled for 2022.

    Recently, Vestas announced it had surpassed 10 GW in firm order intake of V150-4.2 MW turbines globally and with this order Vestas has secured almost 3,5 GW of orders for the turbine variant in Brazil, underlining the V150-4.2 MW’s excellent fit with the country’s wind conditions.

    Source : STRATEGIC RESEARCH INSTITUTE
  17. forum rang 10 voda 4 september 2020 15:28
    Siemens Gamesa Bags 325-MW Order from Onshore Wind Project in Texas

    Siemens Gamesa Renewable Energy has been awarded two new onshore wind project sites in the state of Texas with a total installed capacity of 325 MW. The projects include the supply of 65 SG 5.0-145 wind turbines and a multi-year service agreement. Deliveries are expected to begin in the summer of 2021 with the two sites getting commissioned by end of that year. This win takes Siemens Gamesa's total installed capacity close to 6 GW in Texas, strengthening its position as one of the top 3 Original Equipment Manufacturers in the state.

    The SG 5.0-145 wind turbine from Siemens Gamesa has proven to be a very successful product in the US. Its new state-of-the-art control system with enhanced blade aerodynamics optimizes power generation. It has a flexible power rating that ranges between a 4.0 to 5.0 rating, thereby providing a uniquely tailored solution that fits the specific site conditions. Its modular design allows for increased mechanical capacity and optimal adaptation to logistics and construction requirements, providing greater efficiency and a reduced levelized cost of energy.

    Source : STRATEGIC RESEARCH INSTITUTE
  18. forum rang 10 voda 8 september 2020 15:09
    ABB Supplies Electrical Package & Drives Automation to Grupo Gondi Mill in Monterrey in Mexico

    ABB has supplied and commissioned a full electrical solution for major packaging paper producer Grupo Gondi at its greenfield site in Monterrey Mexico. The project includes switchgear, transformers, motors, drives, and inautomation for the paper machine drive system with the industry’s leading distributed control system, ABB Ability System 800xA. The highly robust solution focuses on quality and efficiency, and ABB will also supply a specialty instrumentation package to enable Gondi to optimize operations while maintaining low energy costs. Commissioning of the project is close to completion, with startup of the paper machine scheduled this month, September 2020.

    ABB worked with Grupo Gondi’s trusted local partner, Grupo BTO, on the supply of the electrical and drives automation system. This collaboration ensures the best lifecycle support for the systems long after start-up is completed.

    Grupo Gondi is the leading company in paper and cardboard packaging, with 65 years of experience in the Mexican market. Currently, Grupo Gondi employs over 7,500 people, with 15 converting plants and 6 recycled paper machines in operation for a current paper production of 650,000 tons per year. With the new paper machine at Monterrey, the Group will increase its capacity to over 1 million tons per year.
    Source : STRATEGIC RESEARCH INSTITUTE
  19. forum rang 10 voda 9 september 2020 15:36
    EDPR to Sell Wind & Solar Portfolio in North America

    USAGlobal leader in the renewable energy sector and one of the largest wind energy producers in the world EDP Renewables has signed a Sale and Purchase Agreement with Connor, Clark & Lunn Infrastructure, to sell an 80% equity shareholding in a wind and solar portfolio located in the United States with 563 MW, comprising four winds farms in operation and one pre-COD solar asset, namely:
    Meadow Lake V of 100 MW, located in Indiana and in operation since 2017
    Quilt Block of 98 MW, located in Wisconsin and in operation since 2017
    Redbed Plains of 99 MW, located in Oklahoma and in operation since 2017
    Hog Creek of 66 MW, located in Ohio and in operation since 2017
    Riverstart Solar of 200 MW, located in Indiana and with start of operations expected in 2021

    The total consideration of the transaction corresponds to an Enterprise Value of USD 676 million for the 80% stake, which translates to an implied enterprise value multiple of USD 1.5 million/MW. The transaction is subject to regulatory and other precedent conditions and 363 MW are expected to be completed in the 4Q20 while 200 MW Riverstart solar project are expected to be completed in 2021.

    Source : STRATEGIC RESEARCH INSTITUTE
  20. forum rang 10 voda 10 september 2020 13:34
    BP en Equinor samen in Amerikaanse windenergie

    (ABM FN-Dow Jones) Het Britse olieconcern BP zet met een investering van 1,1 miljard dollar zijn eerste schreden in de ontwikkeling van windenergie voor de Amerikaanse markt en koopt zich daarmee in in de al bestaande activiteiten die het Noorse Equinor heeft ontwikkeld. Dit maakte BP donderdag bekend.

    Beide partijen gaan aan de slag met de ontwikkeling van 4 parken op 2 al bestaande locaties voor de kust van New York en Massachusetts. Dit moet een gezamenlijk vermogen opleveren om 2 miljoen huishoudens van energie te kunnen voorzien.

    Na de investering hebben beide oliebedrijven een belang van 50 procent in deze samenwerking.

    De deal moet nog door de toezichthouder worden goedgekeurd. BP verwacht de transactie begin 2021 te kunnen afronden.

    Door: ABM Financial News.
    info@abmfn.nl
    Redactie: +31(0)20 26 28 999

    © Copyright ABM Financial News B.V. All rights reserved.
744 Posts
Pagina: «« 1 ... 28 29 30 31 32 ... 38 »» | Laatste |Omhoog ↑

Meedoen aan de discussie?

Word nu gratis lid of log in met je emailadres en wachtwoord.