  1. forum rang 10 voda 2 december 2019 17:12
    Vestas Bags 183 MW order in USA

    Vestas has received an order for 183 MW of V120-2.2 MW turbines for a wind project in the U.S. with a number of turbines operating in 2.0 MW. Including previously purchased 2 MW platform components, the project has a total nameplate capacity of 202 MW. The order includes supply and commissioning of the turbines as well as a 10-year service agreement, designed to ensure optimised performance for the lifetime of the project. Turbine delivery will begin in the second quarter of 2020 with commissioning scheduled for the fourth quarter of 2020.

    The project and customer are undisclosed.

    For updated Vestas photographs and videos, please visit our media images page on: www.vestas.com/en/media/images.

    Source : Strategic Research Institute
  2. forum rang 10 voda 3 december 2019 16:46
    Vineyard Wind Grant to Fall River Redevelopment Authority to Study Future Use of Unused Parcel

    Vineyard Wind and the Fall River Redevelopment Authority announced an agreement for the company to support a study that will analyze potential future use of approximately 3.5 acres of a 6-acre parcel owned by the Authority and lies within the Fall River Waterfront Urban Renewal Plan area. By entering into this agreement Vineyard Wind has agreed to provide the Fall River Redevelopment Authority with $50,000 to begin preparing a study to explore the opportunity of redeveloping the pier for the offshore wind industry.

    Should the site be upgraded following the study, a transformed pier may serve as a base to store components and support wind technician employees responsible for working on the installation and maintenance of future Vineyard Wind projects. It could also feature docks for crew transfer vessels which will transport crew members to and from the offshore site and host state of the art warehouse operations for all the necessary spares and materials needed to support the project.

    Source : Strategic Research Institute
  3. forum rang 10 voda 12 december 2019 19:47
    Vineyard Wind 804 MW Park City Project in Connecticut Approved

    Connecticut Department of Energy and Environmental Protection announced that the company Vineyard Wind’s proposed 804 megawatt Park City Project was selected in response to their 2019 solicitation for offshore wind facilities. Vineyard Wind CEO Mr Lars Pedersen said “Vineyard Wind is proud that our Park City Wind proposal was selected in this competitive process and we are excited to work with Governor Lamont and DEEP to deliver jobs and economic development opportunities to the Bridgeport region and meaningful reductions in harmful carbon emissions.This announcement takes Connecticut one step closer to being the epicenter of the new offshore wind industry, with thriving ports in both Bridgeport and New London. We look forward to building on the work already underway with a network of project partners, local officials, the maritime community, other developers, and all stakeholders involved to make Connecticut a hub for the offshore wind industry in the United States for decades to come.”

    Vineyard Wind is a joint venture of Avangrid Renewables, a subsidiary of AVANGRID Inc which is majority owned by Iberdrola SA and Copenhagen Infrastructure Partners each of which own 50 percent of Vineyard Wind.

    Source : Strategic Research Institute
  4. forum rang 10 voda 12 december 2019 19:49
    Geronimo Energy Announces Commercial Operation of 200 MW South Dakota Wind Farm

    National Grid Pic subsidiary Geronimo Energy announced the start of commercial operations for its Crocker Wind Farm, a 200 megawatt wind energy project located in Clark County in South Dakota. Crocker has Virtual Power Purchase Agreements (in place with leading corporations, Walmart and Cargill. The project was built by Wanzek Construction and utilizes GE 2.7-116 wind turbines.

    Geronimo began working with local landowners to develop Crocker with the intent to positively impact its local and state host communities. Crocker is estimated to have provided hundreds of millions of dollars in economic impact throughout the development and construction phases, including job creation, increased local spending, and capital infrastructure improvements.

    Source : Strategic Research Institute
  5. forum rang 10 voda 18 december 2019 17:02
    Nordex Group to supply N149 turbines for an 86 MW project for Mainstream Renewable Power in Chile

    The Nordex Group has received its first order for its N149/4.0-4.5 turbines from Chile. Mainstream Renewable Power, the global wind and solar development company, has ordered 18 turbines from the Delta4000 series for the "Alena" wind farm. The Nordex Group will supply the N149 turbines in the 4.8 MW operating mode. Mainstream has also signed a Premium Service contract with the Nordex Group for a period of 15 years, with an option to extend by a further five years. Installation of the turbines is due to start in autumn 2020.

    The 86 MW "Alena" wind farm will be built in the region of Bío-Bío. Here, annual average wind speeds of 6.8 metres per second prevail at a hub height of 145 metres. Following completion at the beginning of 2021, "Alena" will provide more than 270 GWh of clean electricity a year.

    is the world’s only independent developer of utility-scale wind and solar power assets with a global footprint. The company is focused on delivering a high-quality portfolio of more than 9 GW of wind and solar assets across Latin America, Africa, Asia Pacific as well as the Offshore wind sector globally. Mainstream is currently constructing 1.5 GW across Latin America and Africa. In Chile, Mainstream’s wholly-owned 1.3 GW of fully contracted wind and solar assets are on track to reach commercial operation from 2021. In Africa, the company has delivered 600 MW of wind and solar assets into commercial operation in South Africa and currently has 250 MW of wind assets in construction there. Mainstream is a world leader in the development of offshore wind assets. Mainstream’s Soc Trang 800MW offshore wind development in Vietnam is South East Asia’s single largest renewable energy development. Mainstream has raised more than EUR2.1bn in project finance to date and employs 260 staff across five continents. www.mainstreamrp.com

    Source : Strategic Research Institute
  6. forum rang 10 voda 19 december 2019 20:07
    Vestas to supply 224 MW of V120-2.2 MW Wind Turbines for Wind Project in the US

    The order includes supply and commissioning of the turbines as well as a 10-year service agreement, designed to ensure optimised performance for the lifetime of the project. Turbine delivery will begin in the second quarter of 2020 with commissioning scheduled for the fourth quarter of 2020.

    The project and customer are undisclosed.

    Source : Strategic Research Institute
  7. forum rang 10 voda 20 december 2019 13:56
    ALLETE Clean Energy Wind Facility Goes Online to Power Upper Midwest

    ALLETE Clean Energy announced that it Glen Ullin Energy Center about 40 miles west of Bismarck, North Dakota, is now online and producing wind power for Xcel Energy customers in the Upper Midwest. Glen Ullin Energy Center, a 106-megawatt wind facility, produces enough electricity to power about 55,650 homes from its 43 2.3- and 2.5-megawatt General Electric turbines. It will employ about 10 people during operation, and provide property tax and other business benefits to area communities and lease payments to landowners.

    Glen Ullin Energy Center is the third North Dakota wind expansion project developed and built by ALLETE Clean Energy, and the first it will own and operate. It also developed the 107.5-megawatt Thunder Spirit wind farm near Hettinger and sold it to Montana-Dakota Utilities in 2015. ALLETE Clean Energy expanded Thunder Spirit to about 155 megawatts and sold the expansion to MDU in 2018.

    Source : Strategic Research Institute
  8. forum rang 10 voda 20 december 2019 13:57
    Partnership Adds 750 MW to Wyoming’s Wind Energy Portfolio

    Mortenson has been selected by valued partner Rocky Mountain Power, an operating entity of PacifiCorp, a subsidiary of Berkshire Hathaway Energy, to construct the TB Flats I & II Wind Energy Project and the Ekola Flats Wind Energy Project in Medicine Bow, Wyoming. The two projects are 20 miles apart and will have a combined wind energy capacity of 750 MW. TB Flats I & II spans 44 square miles and will contain 132 Vestas turbines totaling 500 MW. Ekola Flats spans 29 square miles and will contain 10 GE and 53 Vestas turbines totaling 250 MW. Erection at TB Flats I & II is scheduled to begin in April of 2020 and Ekola Flats will start in June 2020. Both projects are scheduled to complete in October of 2020. Currently, foundations are being placed at both projects.

    Mortenson’s scope of work for both projects includes access roads, foundations, collection, substation, transmission lines, tower wiring and erection of turbines. Mortenson will self-perform all foundation, collection, turbine erection and substation construction. At peak construction, 200-250 people will be employed at each site.

    Source : Strategic Research Institute
  9. forum rang 10 voda 20 december 2019 13:59
    GWEC and OLADE to Drive Energy Transition in Latin America

    The Global Wind Energy Council and OLADE, the Latin American Energy Association, have announced they have signed a Memorandum of Understanding to drive the energy transition in Latin America. Both organisations have the objective of promoting energy security and the energy transition in Latin America, and this MoU will establish the basis for cooperation for the design and implementation of projects as well as reports and roadmaps for renewable energy development in the region.

    Under the framework of the MoU, the two organisations agree to exchange information, commit to technical assistance and technology transfer, realise joint studies, research and publications, organise events and other mutual activities, as well as facilitate the exchange of expertise for each organisation’s activities. By pooling together both organisation’s respective knowledge and expertise to address these topics, Latin America’s energy transition can be accelerated to deliver clean and cost-competitive energy to all in the region.

    Key topics that GWEC and OLADE will cooperate on include: development of sustainable energy; energy economics; project financing frameworks for energy; energy planning, management and integration of wind power in the energy systems in the region; energy policy and regulatory frameworks.

    The first joint report between GWEC and OLADE will cover renewable energy auctions in Latin America and will be published in early 2020.

    Source : Strategic Research Institute
  10. forum rang 10 voda 27 december 2019 11:53
    Nordex Group Bags Service Contracts for 150 MW in Uruguay and US

    The Nordex Group has received three new orders for the full maintenance of a total of 61 turbines in Uruguay and the US. In Uruguay, the Nordex Group will maintain 21 N117/2400 turbines at the Florida wind farm, near the city of Florida, about 110 kilometres north of Montevideo. The customer is Akuo. The turbines have been in operation since December 2014 and have been serviced by Nordex ever since. Now Akuo Energy has extended the full service for the 50.4 MW wind farm for a further five years.

    The second extension of a full service contract in Uruguay is for a 50 MW wind farm comprising 20 N100/2500 turbines that have been in operation in Cerro Largo, in the north-east of the country, since October 2015. The extended service contract with the Nordex Group is for a further six years.

    Both wind farms maintained by the Nordex Group have had availability of between 98 and 99 percent in recent years.

    The third contract the Nordex Group has received is to provide Premium service for a 50 MW wind farm in Maryland, USA. The project is comprised of 20 N90/2500 wind turbines. The Nordex Group has been providing O&M services to the project since operations commenced in 2011. This extension renews the service agreement for 10 years.

    Source : Strategic Research Institute
  11. forum rang 10 voda 30 december 2019 16:01
    Vestas bouwt windturbines voor VS

    (ABM FN-Dow Jones) Vestas heeft een order gekregen voor het leveren van 69 windturbines in de Verenigde Staten. Dit maakte de Deense producent van windturbines maandag bekend zonder financiële details te geven.

    Het betreft 12 turbines met een vermogen van 2,0 megawatt en 57 turbines van 2,2 megawatt.

    De in totaal 149 megawatt is voor een windproject in de VS. De naam van de afnemer en het betreffende project werden niet bekendgemaakt.

    Eerder vandaag meldde Vestas ook al orders uit Rusland en Italië. Ook hier ontbraken de financiële details.

    Door: ABM Financial News.
    info@abmfn.nl
    Redactie: +31(0)20 26 28 999

    © Copyright ABM Financial News B.V. All rights reserved.
  12. forum rang 10 voda 3 januari 2020 17:18
    Enel starts operations of 450 MW wind farm in U.S. and expands project to 500 MW through new PPA with Danone North America

    Enel, through its US renewable subsidiary Enel Green Power North America, Inc, has started operations of its 450 MW High Lonesome wind farm in Upton and Crockett Counties, in Texas, the largest operational wind project in the Group’s global renewable portfolio. Enel also signed a 12-year, renewable energy power purchase agreement with food and beverage company Danone North America, a Public Benefit Corporation, for physical delivery of the renewable electricity associated with 20.6 MW, leading to an additional 50 MW expansion of High Lonesome that will increase the plant’s total capacity to 500 MW.

    The construction of the 50 MW expansion is currently underway and operations are due to start in the first quarter of 2020.

    Source : Strategic Research Institute
  13. forum rang 10 voda 7 januari 2020 20:22
    Vestas secures 30 MW order in Mexico

    Vestas has received a 30 MW order for a project in Mexico. The contract includes the supply and installation of 15 V120-2.0 MW wind turbines as well as an Active Output Management 5000 (AOM 5000) service agreement for the operation and maintenance of the wind park over the next 20 years. Turbine delivery is expected by the fourth quarter of 2020 whilst commissioning is planned by the second quarter of 2021.

    The project and customer are undisclosed.

    Vestas pioneered the Mexican wind energy market in 1994, when it erected the country’s first commercial wind turbine. Since then, Vestas has accumulated over 2.3 GW of installed capacity or under construction in Mexico.

    Source : Strategic Research Institute
  14. forum rang 10 voda 10 januari 2020 19:36
    DNV GL Reviews Renewable Assets for Tokyo Gas’s Mexican market entry

    DNV GL has reviewed an almost 900-MW renewable portfolio in Mexico during technical due diligence for the acquisition of a 50%-share of the portfolio by Tokyo Gas Co Ltd Japan's largest provider of city gas. The acquisition is Tokyo Gas’s first investment in the Mexican renewable energy sector. The portfolio comprises two onshore wind plants and four solar photovoltaic assets, totalling 898.7 MW. Tokyo Gas and ENGIE have created a 50/50 joint venture to develop these renewable energy projects. The investment is a further step in Tokyo Gas’s commitment to make its business both more sustainable and more international.

    It also reflects the high interest global investors from a range of industries are showing in the Latin American renewable energy market. In recent years, Latin America has developed as an increasingly attractive market for renewable energy investments. With growing expectations and opportunities for foreign investment, market complexity becomes a challenge for foreign companies, particularly investors from other industries.

    The technical due diligence conducted included an independent assessment of the energy production for each wind and solar asset as well as reviews of the design and technology, permit status, available construction and operation agreements, and financial model assumptions. This assessment is key for investors to estimate the risk and return of investments.

    Source : Strategic Research Institute
  15. forum rang 10 voda 10 januari 2020 19:42
    Vestas Receives 149 MW Order in USA

    Vestas has received an order for 149 MW of turbines, consisting 12 V110-2.0 MW turbines and 57 V120-2.2 MW turbines for a wind project in the US. The order includes supply and commissioning of the turbines as well as a multi-year service agreement, designed to ensure optimised performance for the lifetime of the project. Turbine delivery will begin in the first quarter of 2020 with commissioning scheduled for the fourth quarter of 2020.

    The project and customer are undisclosed.

    Source : Strategic Research Institute
  16. forum rang 10 voda 29 januari 2020 20:06
    Scout Closes Construction Financing for Indiana Wind Farm

    Colorado based renewable energy developer, owner and operator Scout Clean Energy announced the closing of construction financing and tax equity commitments for the 130 MW Bitter Ridge Wind Farm in Jay County in Indiana.

    Bitter Ridge has been developed by Scout and will be owned and operated long-term by Scout’s dedicated asset management team.

    Scout is a portfolio company of Quinbrook Infrastructure Partners, a specialist investment manager focused exclusively on lower carbon and renewable energy infrastructure investment and operational asset management in the US, UK and Australia.

    Source : Strategic Research Institute
  17. forum rang 10 voda 26 februari 2020 06:20
    Vestas Bags 108 MW EPC Order in Mexico

    Vestas has secured an engineering, procurement and construction order for the 108 MW Energía Sierra Juárez II wind park, to be located in Tecate in Baja California in Mexico. The contract includes the supply, transport, installation and commissioning of 26 V150-4.2 MW of which some are delivered on 4.0 MW operating mode. The order has been placed by Energía Sierra Juárez, a joint venture between IEnova, a Sempra Energy Company, one of the largest private energy companies in Mexico, and Saavi Energía, the third largest independent energy producer in the country. The order also includes an Active Output Management 5000 (AOM 5000) service agreement for the operation and maintenance of the wind park over the next 15 years.

    The energy produced by this project will be commercialised through a PPA contract with the utility San Diego Gas & Electric.

    Turbine delivery is expected in the third quarter of 2020 whilst commissioning is planned for the second quarter of 2021.

    Source : Strategic Research Institute
  18. forum rang 10 voda 26 februari 2020 06:22
    Nordex to Supply Wind Turbines for 83 MW Wind Farm in Brazil

    Nordex has received an order to supply 24 AW132/3465 wind turbines for the fourth construction phase of a wind farm complex in Brazil. The contract also includes a service agreement for maintenance and repair of the wind turbines for a period of 15 years. The site of the wind farm is located in the state of Rio Grande do Norte near to the city of São Miguel do Gostoso, on the Atlantic. It consists of four individual sections, of which the Nordex Group also set up the 50 AW132 turbines for the first three construction phases. After completion of the fourth phase the wind farm complex will comprise a total of 74 turbines with an overall installed capacity of more than 256 MW.

    The Nordex Group will install the 24 turbines on 120 metre concrete towers. The company will be producing the concrete towers required in its local factory in Areia Branca, near to the site. The nacelles will be built in the manufacturer’s plant in Bahia. The Nordex Group will also be obtaining the rotor blades from Brazil in order to ensure that the project includes the maximum share of local production.

    The Group has installed more than 27 GW of wind energy capacity in over 40 markets and in 2018 generated revenues of around EUR 2.5 billion. The company has more than 6,500 employees. The joint manufacturing capacity includes factories in Germany, Spain, Brazil, the United States, India, Argentina and Mexico. The product portfolio is focused on onshore turbines in the 2.4 to 5.X MW class, which are tailor-made for the market requirements of countries with limited space and regions with limited grid capacity.

    Source : Strategic Research Institute
  19. forum rang 10 voda 6 maart 2020 20:42
    Greentown Labs and Vineyard Wind to Support Offshore Wind Innovation

    North American cleantech incubator in Greentown Labs and Vineyard Wind, developer of the first utility-scale offshore wind energy generation facility in the Northeast United States, announced their partnership to run a Greentown Launch accelerator program focused on offshore wind innovations. The Greentown Labs and Vineyard Wind Launch program will identify and deploy innovations that enhance offshore monitoring technologies focused on protecting marine mammals. To do so, the organizations will collaborate on a 10-month Greentown Launch program, Greentown Labs’ flagship accelerator program designed to advance new venture creation and corporate partnerships with the industry’s most promising cleantech entrepreneurs. Together, Greentown Labs and Vineyard Wind will support early-stage startups developing technologies to improve the offshore wind energy and marine life value chains by providing the resources, training, and expert mentorship they need to advance their innovations. The Launch program will aim to forge strategic relationships between selected entrepreneurs, Vineyard Wind, and Vineyard Wind’s partners. Greentown Labs and Vineyard Wind will announce a detailed “Request for Proposals” in the near future.

    Over the past five years, Greentown Labs has successfully conducted Greentown Launch programs across a variety of clean energy areas including solar, hydrogen, digital energy, the circular economy and more. Each program features unique partners and topic areas, a customized application and acceptance process, and three intensive two-day workshops to facilitate connections among the startups and supporting partners.

    Greentown Labs and Vineyard Wind will release the request for proposals in March 2020 and aim to announce selected startup participants at a public kickoff event in July 2020. The organizations will also host a final showcase to celebrate the completion of a successful program in February 2021. To learn more about the Greentown Labs and Vineyard Wind Launch program, please contact launch@greentownlabs.com.

    Source : Strategic Research Institute
  20. forum rang 10 voda 6 maart 2020 20:46
    Nordex Group Bags Order for 33 turbines for 156 MW Wind Farm in Chile

    The Nordex Group has received a large order for building a wind farm with turbines from the Delta4000 generation in Chile. The 156 MW wind farm will comprise 33 N149/4.0-4.5 turbines. In addition to this, the customer has opted for the Premium Service for a period of 15 years.

    The wind farm is located 30 kilometres to the north of the Puerto Varas city in the Los Lagos region. The turbines will be installed on 145 meter tubular steel towers in order to take maximum advantage of the wind conditions prevailing there. After its completion 2021 the wind farm will be able to supply 180,000 households with clean electricity.

    Source : Strategic Research Institute
744 Posts
Pagina: «« 1 ... 26 27 28 29 30 ... 38 »» | Laatste |Omhoog ↑

Meedoen aan de discussie?

Word nu gratis lid of log in met je emailadres en wachtwoord.