    Vandaag keurde de raad van bestuur van Ørsted het tussentijdse verslag voor het eerste halfjaar van 2021 goed.

    In een notendop:
    Ørsted Q2 EBITDA Better Than Expected; Sees FY at Lower End of Guidance
    (PLX AI) - Ørsted Q2 EBITDA DKK 8,196 million vs. estimate DKK 7,850 million.
    • Q2 ROCE 13%
    • Q2 free cash flow DKK 1,605 million
    • Ørsted Full-year EBITDA guidance maintained despite low wind speeds
    • Ørsted currently expect the outcome in the low end of the guided range
    • Outlook FY investments DKK 39,000-41,000 million

    Er is een aanzienlijke toegenomen offshore capaciteit in de VS en verschillende strategische partnerschappen tot stand gebracht in de eerste helft.
    De EBITDA-prognose voor het hele jaar bleef behouden ondanks de lage windsnelheden.
    Onze bedrijfswinst (EBITDA) voor het eerste halfjaar bedroeg DKK 13,1 miljard, een stijging van DKK 3,3 miljard vergeleken met dezelfde periode vorig jaar. De stijging was te danken aan een winst van DKK 5,4 miljard uit de 50% uitbouw van ons Nederlandse offshore windpark Borssele 1 & 2.

    De inkomsten van onze offshore en onshore windparken in bedrijf waren DKK 0,3 miljard lager in vergelijking met dezelfde periode vorig jaar. De toegenomen opwekkingscapaciteit van nieuwe windparken die in gebruik zijn, werd meer dan tenietgedaan door aanzienlijk lagere windsnelheden in onze portefeuille. Zoals verwacht hadden hogere TNUoS-tarieven als gevolg van meer Britse windparken, lagere inkomsten uit Horns Rev 2 vanwege de subsidieperiode die eindigde in oktober 2020 en lagere ROC-recyclingprijzen ook een negatief effect.

    De inkomsten uit bestaande samenwerkingsverbanden daalden met DKK 1,8 miljard vergeleken met dezelfde periode vorig jaar. H1 2020 zag hoge inkomsten uit de bouwovereenkomst met betrekking tot de Hornsea 1-transmissie-activa, terwijl H1 2021 negatief werd beïnvloed door een garantievoorziening aan partners in verband met problemen met kabelbeschermingssysteem bij sommige van onze offshore windparken, zoals eerder dit jaar aangekondigd.

    Onze Bio energy & andere-activiteiten slaagden erin om inkomsten te behalen die in lijn waren met dezelfde periode vorig jaar, ondanks de desinvestering van onze Deense activiteiten op het gebied van stroomdistributie, residentiële klanten en stadsverlichting in augustus 2020. Dit was te danken aan uitzonderlijke prestaties van onze WKK-installaties en hoge inkomsten van onze gashandel.

    De nettowinst bedroeg DKK 7,1 miljard en het rendement op het geïnvesteerd vermogen (ROCE) kwam uit op 12,5%.

    We handhaven onze EBITDA-verwachting van DKK 15-16 miljard voor het hele jaar. Vanwege de aanzienlijk lager dan normale windsnelheden in ons gehele offshore windpark (inclusief in juli) en de garantiebepaling jegens onze partners met betrekking tot problemen met kabelbeschermingssystemen bij sommige van onze windparken, verwachten we momenteel de uitkomst in de lage einde van het begeleide bereik.
    De begeleiding is gebaseerd op een aanname van normale windsnelheden in de laatste vijf maanden van het jaar. In lijn met voorgaande jaren is in onze EBITDA-richtlijnen geen winst uit nieuwe partnerships gedurende het jaar opgenomen, wat betekent dat de winst uit de Borssele 1 & 2 farm-down is uitgesloten van onze jaarprognose.

    Met de afronding van de acquisitie van het Europese onshore groeiplatform Brookfield Renewable Ireland in juni en de verwachte acquisitie van het volledig gebouwde 302 MW Amerikaanse onshore windproject Lincoln Land later dit jaar, verhogen we onze bruto-investeringsverwachting voor het hele jaar van DKK 32- 34 miljard tot DKK 39-41 miljard.

    cc: investegate.co.uk
  2. forum rang 10 voda 19 augustus 2021 08:18
    Orsted Signs Power Purchase Agreement with Microsoft

    Ørsted and Microsoft Corporation have entered into an agreement for Microsoft to purchase energy from Old 300 Solar Center in Fort Bend County, Texas. Per the terms of Ørsted's agreement, Microsoft will buy power from Ørsted's 430 MWAC solar energy center Old 300 in Fort Bend County, Texas, which is expected to come online in Q2 2022.

    Old 300 Solar Center is located on approximately 2,800 acres of privately owned land located near the City of Needville in Fort Bend County, Texas. The project represents an investment of more than USD 400 million in the local community that'll benefit landowners, schools, and other community services for years to come via lease payments and property taxes.

    Source - Strategic Research Institute
  3. Joni-2 26 augustus 2021 12:34
    Orsted en Eversource hebben aangekondigd dat het eerste in Amerika gebouwde offshore windsubstation zal worden ingezet bij het 132MW South Fork Wind-project van de ontwikkelaars door Kiewit Offshore Services.

    Kiewit, de grootste offshore-fabrikant in de VS, zal het onderstation ontwerpen en bouwen voor het South Fork Wind-project, het eerste offshore windpark van New York.

    Het 1.500 ton wegende, 60 meter hoge onderstation zal worden gebouwd in de fabriek van Kiewit in Ingleside, Texas, in de buurt van Corpus Christi.
    Meer dan 350 werknemers in drie staten zullen deze South Fork Wind-structuur ondersteunen.

    De fabricagemedewerkers in Ingleside worden ondersteund door teams in Houston en Kansas.

    Daarnaast zullen honderden vakbondsmedewerkers in het noordoosten het South Fork Wind-project en aanvullende initiatieven in de regio ondersteunen.

    Door Kiewit te selecteren, is Orsted, samen met Eversource, de eerste Amerikaanse ontwikkelaar van offshore windenergie die een Amerikaanse aannemer selecteert om het offshore-substation van een windmolenpark te fabriceren.

    David Hardy, CEO van Orsted Offshore Noord-Amerika, zei: " We helpen een nieuwe Amerikaanse maakindustrie op te bouwen die duizenden goedbetaalde banen zal creëren, niet alleen in het noordoosten, maar in gemeenschappen in de hele Verenigde Staten.
    " We zijn trots om samen te werken met Kiewit om het eerste in Amerika gemaakte offshore windsubstation te leveren.
    "Dit initiatief maakt deel uit van onze toewijding om te leveren voor onze langetermijnpartners, door internationale ervaring te combineren met lokale expertise in gemeenschappen in het hele land."


    Eversource Energy-topman en president Joe Nolan voegde toe: " Het bereiken van de doelstellingen voor schone energie van ons land zal grotendeels afhankelijk zijn van in de VS gevestigde bedrijven zoals Kiewit, en we zijn verheugd om met hen samen te werken om het eerste in de VS gemaakte offshore windstation te leveren.
    "Onze samenwerking met Kiewit markeert een nieuwe belangrijke mijlpaal voor de Amerikaanse offshore windindustrie en signaleert de groei van de volgende grote maritieme industrie in het hele land.
    "We zijn toegewijd aan het creëren van een toekomst met schone energie en het bevorderen van kansen voor alle Amerikanen."


    Offshore windonderstations zijn cruciale componenten van offshore windparken op utiliteitsschaal.
    Onderstations verzamelen de stroom van windturbines en sluiten de schone energie aan op het net.
    Het offshore onderstation zal bestaan uit een topside die rust op een monopile fundering.

    renews.biz/71822/orsted-selects-us-fa...
  4. Joni-2 7 september 2021 13:30
    Orsted, ATP kiest bouwteam voor Deens energie-eiland
    Aarsleff, Bouygues en Van Oord (NL) 'brengen uitgebreide ontwerp- en engineeringcompetenties'
    Aarsleff, Bouygues en Van Oord "brengen uitgebreide ontwerp- en engineeringcompetenties mee", evenals ervaring van complexe offshore-bouwprojecten over de hele wereld, aldus de partners.

    • Aarsleff, de Deense specialist in grootschalige projecten op het gebied van infrastructuur, klimaatadaptatie en energie, zal de bouw leiden.
    Het bedrijf heeft 600 funderingen geïnstalleerd voor offshore windturbines bij onder meer Horns Rev 2 en London Array Offshore Wind Farm.
    Aarsleff was ook een belangrijke bouwpartner bij de Oresund Link die Denemarken en Zweden verbindt en heeft verschillende havenuitbreidingsprojecten in Scandinavië geleid, waaronder de havens van Skagen, Frederikshavn en Stockholm.

    • Bouygues Travaux Publics, een dochteronderneming van Bouygues Construction, brengt expertise in het ontwerpen, bouwen en exploiteren van grootschalige offshore-constructies, zoals bruggen, tunnels en landaanwinningen.

    • Van Oord heeft de Palm Jumeirah en vele andere kunstmatige eilanden gebouwd en heeft tientallen jaren ervaring met het installeren van offshore windturbines, funderingen en kabels.
    Het bedrijf heeft met Orsted gewerkt aan offshore-projecten in verschillende landen over de hele wereld en heeft zijn hoofdkantoor in Rotterdam, Nederland.

    Rasmus Errboe, hoofd van Orsted Continental: “Orsted heeft 30 jaar ervaring in het werken met zeer gespecialiseerde engineeringbedrijven in offshore wind.
    “Aarsleff, Bouygues en Van Oord vormen het sterkst mogelijke team om ons bod op het Deense energie-eiland in de Noordzee te ondersteunen.
    “We zijn bereid om de groene transitie op een nieuwe en innovatieve manier te versnellen die zal bijdragen aan de transformatie van het Deense energiesysteem en de Deense samenleving ten goede zal komen, terwijl we groene oplossingen bieden voor Denemarken en onze Europese buren.
    "We hebben deze leveranciers van wereldklasse geselecteerd op basis van hun uitstekende referenties op het gebied van duurzaamheid en innovatie om ervoor te zorgen dat het energie-eiland wordt gebouwd met respect voor de unieke omgeving in de Noordzee en met de hoogste graad van technische en commerciële competenties."


    Het North Sea Energy-eiland zal naar verwachting in 2023 worden aanbesteed, waar Orsted en ATP van plan zijn een bod uit te brengen.
    Het Deense Energieagentschap nodigt potentiële inschrijvers ook uit om deel te nemen aan een oriënterende bijeenkomst als onderdeel van de tweede marktdialoog over het aanbestedingskader voor de bouw en mede-eigendom van het Energie-eiland in de Noordzee.

    De oriënterende bijeenkomst zal de start van de tweede marktdialoog over het aanbestedingskader voor de bouw en mede-eigendom van het Energie-eiland in de Noordzee en biedt potentiële inschrijvers de mogelijkheid om een overzicht en verdere details te krijgen van de besluiten uit het politiek akkoord .
    De oriënterende bijeenkomst informeert de deelnemers ook over het verdere proces naar de lancering van het aanbestedingsproces.
    De fysieke oriëntatievergadering zal op 15 september plaatsvinden in het kantoor van het Deense Energieagentschap in Kopenhagen.

    In de eerste fase van het project zullen tegen 2030 naar verwachting ongeveer 200 windturbines met een gecombineerd vermogen van 3 GW worden geïnstalleerd.
    Wanneer het volledig is ontwikkeld, zal het energie-eilandknooppunt op de Noordzee een capaciteit van 10 GW bereiken.

    cc: renews.biz
  5. Joni-2 7 september 2021 13:40
    Orsted A/S: EU OYSTER Consortium kiest Grimsby in UK, voor innovatief waterstofproject

    Groene waterstof is snel in opkomst als een belangrijk instrument in de groene transformatie en biedt een duidelijk groen pad voorwaarts voor veel sectoren die anders moeilijk koolstofarm zouden kunnen worden gemaakt, zoals de zware industrie en zwaar transport. De ontwikkeling van offshore waterstofproductie, door gebruik te maken van elektrolysers die alleen water en hernieuwbare elektriciteit nodig hebben om hernieuwbare waterstof op te wekken, vergroot dit potentieel door een middel te bieden om goedkope hernieuwbare energie te transporteren van gebieden met uitstekende hulpbronnen naar vraagcentra.

    Om de doelstelling van de EU-waterstofstrategie van 40 GW aan elektrolysers tegen 2030 te bereiken, zullen naar verwachting zowel onshore als offshore elektrolysers nodig zijn. Het OYSTER-project - dat wordt uitgevoerd door een consortium van ITM Power, Ørsted, Siemens Gamesa Renewable Energy en Element Energy - zal een volledig gemarineerde elektrolyser op megawattschaal ontwikkelen en testen in een proefproef aan wal, die zal worden gevestigd in Grimsby.

    Het project onderzoekt ook de haalbaarheid en het potentieel om een ??offshore windturbine rechtstreeks te combineren met een elektrolyser en om hernieuwbare waterstof naar de kust te transporteren. Het project wordt voor 100% gefinancierd door de FCH JU, een publiek-private samenwerking van de Europese Commissie, die het project in januari 2021 5 miljoen euro heeft toegekend

    Het OYSTER-consortium selecteerde Grimsby vanwege de sterke connectie van de regio met hernieuwbare energie, met name offshore wind. Grimsby is de thuisbasis van de O&M-hub voor de activiteiten aan de oostkust van Ørsted, waaronder Hornsea One en Hornsea Two, die na voltooiing in 2022 het grootste offshore windpark ter wereld zullen zijn. Beide offshore windparken maken gebruik van Siemens Gamesa-turbines en zijn uitgerust met bladen die zijn vervaardigd in Romp. De Humber is ook de thuisbasis van Gigastack, dat een blauwdruk ontwikkelt voor de inzet van hernieuwbare waterstof op industriële schaal uit offshore wind. Het Gigastack-project wordt geleid door een apart consortium, bestaande uit ITM Power, Ørsted, Element Energy en Phillips 66 Limited.

    Vanwege de hoge dichtheid van energie-intensieve industrieën zoals raffinaderijen, krachtcentrales, staalfabrieken en glasfabrieken die de oevers van de Humber flankeren, is de regio de grootste industriële cluster van het VK wat betreft kooldioxide-emissies; 12,4MtCo2/jr. Decarbonisatie van de Humber is van vitaal belang voor het wettelijk bindende streefcijfer van nul in 2050 in het VK, evenals voor de toekomstige economie van de Humber, en hernieuwbare waterstof in combinatie met offshore windenergie zou een centrale rol kunnen spelen bij het bereiken van deze ambitie.

    Om het potentieel van offshore waterstofproductie te realiseren, is er behoefte aan compacte elektrolysesystemen die bestand zijn tegen zware offshore-omgevingen en minimale onderhoudsvereisten hebben, terwijl ze toch voldoen aan de kosten- en prestatiedoelstellingen die de productie van goedkope waterstof mogelijk maken. Het OYSTER-project zal hierin een belangrijke stap vooruit betekenen.

    Het OYSTER-elektrolysersysteem zal compact worden ontworpen, zodat het kan worden geïntegreerd met een enkele offshore windturbine en het productieprofiel van de turbine zal volgen. Bovendien zal het elektrolysesysteem ontziltings- en waterbehandelingsprocessen integreren, waardoor het mogelijk wordt om zeewater te gebruiken als grondstof voor het elektrolyseproces.

    ITM Power is verantwoordelijk voor de ontwikkeling van het elektrolysersysteem en de elektrolyserproeven, terwijl Ørsted de offshore-implementatieanalyse zal leiden, de haalbaarheidsstudie van toekomstige fysieke offshore-elektrolyserimplementaties, en ITM Power zal ondersteunen bij het ontwerp van het elektrolysersysteem voor marinisatie en testen . Siemens Gamesa Renewable Energy en Element Energy leveren technische en projectmanagementexpertise.

    • Dr. Graham Cooley, CEO van ITM Power, zei: 'Hernieuwbare waterstof is de schoonste brandstof die vandaag voor ons beschikbaar is. Het benutten van offshore windenergie en het opwekken van hernieuwbare waterstof met behulp van water in het proces van elektrolyse, biedt een route om het gehele energiesysteem koolstofarm te kunnen maken. ITG Power is verheugd deze stap naar een groenere, schonere toekomst te ondersteunen'

    • Duncan Clark, hoofd van de Britse regio voor Ørsted, zei : ' De combinatie van offshore wind en hernieuwbare waterstofproductie heeft een baanbrekend potentieel om sectoren die anders moeilijk te verminderen zijn koolstofarm te maken, en als het grootste offshore windbedrijf ter wereld onderzoeken we offshore windenergie. waterstofproductie als toekomstige, aanvullende manier om grote hoeveelheden hernieuwbare energie, opgewekt uit overvloedige offshore wind, te krijgen waar het nodig is . Net als bij het opschalen van wind op zee, kunnen vroege lessen uit dit soort projecten dan in de hele regio en wereldwijd worden ingezet.'

    • Michael Dolman, Partner bij Element Energy, zei : ' Sinds we de oprichting van het OYSTER-project hebben ondersteund, hebben we een groeiend aantal projecten gezien die offshore waterstofproductie plannen en een toenemende belangstelling voor dit gebied van een breed scala van belanghebbenden. Met de selectie van een locatie voor de demonstrator vordert OYSTER goed en zal het een waardevolle rol spelen in de opmars van elektrolysetechnologie voor offshore toepassingen.'

    • Bart Biebuyck, uitvoerend directeur, Fuel Cells and Hydrogen Joint Undertaking (FCH JU), zei : "Om de uitdagende doelstelling van de EU-waterstofstrategie van 40 GW met hernieuwbare energie gevoede elektrolysers tegen 2030 te halen, zullen offshore windparken een essentiële rol spelen. Afhankelijk van de lokale omstandigheden kan het optimaal zijn om de elektrolysers offshore te verplaatsen en waterstof te transporteren in plaats van elektriciteit naar de kust. De FCH JU is er trots op het OYSTER-project te ondersteunen als springplank voor offshore-elektrolysers door de ontwikkeling van een volledig 'gemarineerde' elektrolyser op MW-schaal die direct aan de zee wordt getest en daarom continu bijdraagt ??aan de ontwikkeling van technologieën voor een klimaatneutrale toekomst.'

    cc: marketscreener.com
  6. Joni-2 9 september 2021 18:54
    Ørsted en T&T ondertekenen MoU over strategische samenwerking voor offshore windprojecten in Vietnam

    09 september 2021 09:49 ET | Bron: Ørsted A/S

    Ørsted, 's werelds meest duurzame energiebedrijf, en T&T Group, een toonaangevend Vietnamees multi-industrieel bedrijf met 80.000 werknemers, hebben vandaag de ondertekening aangekondigd van een memorandum van overeenstemming (MOU) om een ??strategische samenwerking op het gebied van offshore wind in Vietnam te lanceren. De ondertekening vond plaats in het kader van het Vietnamese bezoek op hoog niveau aan Brussel, onder leiding van de voorzitter van de Nationale Vergadering van Vietnam, Zijne Excellentie Vuong Dinh Hue.

    De samenwerking tussen Ørsted en T&T brengt een multi-GW pijplijn van greenfield offshore windprojecten samen voor de kusten van de provincies Binh Thuan en Ninh Thuan, de meest geschikte gebieden van Vietnam voor offshore windontwikkeling. Beide partners zullen de gezamenlijke capaciteiten van hun groepen toepassen om deze offshore windpijpleiding te laten rijpen en werken aan de ondersteuning van de ontwikkeling van een effectief regelgevend kader voor offshore windenergie en een levendige nieuwe industrie in Vietnam.

    Met meer dan 3.200 km kustlijn en hoge constante windsnelheden, heeft Vietnam enkele van de beste omstandigheden voor de ontwikkeling van offshore wind in Azië. De Wereldbankgroep schat het offshore windpotentieel van Vietnam op 500 GW. Naast dit potentieel van wereldklasse, betekent de snel groeiende vraag naar stroom in Vietnam dat er de komende decennia dringend behoefte is aan nieuwe grootschalige betrouwbare stroombronnen. Deze factoren, in combinatie met het sterke supply chain-potentieel van Vietnam, hebben Ørsted en T&T Group ervan overtuigd dat offshore wind een centrale rol zal spelen in de toekomstige energiemix van Vietnam.

    Do Quang Hien, T&T Group President en General Director, zegt: “Tien jaar geleden begonnen we met het onderzoeken en voorbereiden van de ontwikkeling van hernieuwbare energie om klaar te zijn wanneer de tijd rijp was. Dit heeft ertoe geleid dat T&T verschillende grote zonne-PV-projecten heeft voltooid en op schema ligt om tegen het einde van dit jaar vijf grote onshore windprojecten te voltooien. Energie is een strategische focus voor de T&T Group, en met deze samenwerking met Ørsted, de wereldleider in offshore wind, kijken we ernaar uit om onze plannen te versnellen en waardevolle ervaring en internationaal investeringskapitaal naar de offshore windsector in Vietnam te brengen.”

    Martin Neubert, Chief Commercial Officer en Deputy-CEO bij Ørsted, zegt: “Als wereldwijde leider op het gebied van offshore wind, streeft Ørsted naar 30 GW offshore wind in 2030. Om deze ambitieuze uitbouw te ondersteunen, moeten we nauw samenwerken met partners zoals T&T, die een indrukwekkende staat van dienst heeft in het ontwikkelen van grote energieprojecten in Vietnam, en die een diepgaande kennis van de markt heeft. Onze missie is om een ??wereld te creëren die volledig draait op groene energie, en om dit te doen, hebben we sterke steun nodig, dus het is een groot genoegen om een ??marktleider als T&T de handen ineen te slaan bij het creëren van een duurzamere toekomst in Vietnam.”

    Matthias Bausenwein, president van Ørsted Asia Pacific, zegt: “Dit MOU is een belangrijke stap voor Ørsted om een ??sterke positie in Vietnam te verwerven en om onze ambitie te tonen om een ??betrouwbare langetermijnpartner in dit land te zijn. Samen met T&T zijn we verheugd om onze multi-GW-pijplijn te gebruiken om een ??levendige lokale offshore windindustrie op te bouwen en om van Vietnam een ??van de toonaangevende offshore windmarkten in Azië-Pacific te maken. Wij zijn van mening dat wind op zee een van de beste manieren is voor Vietnam om aan zijn snel groeiende vraag naar energie te voldoen, aangezien dit een betrouwbare, binnenlandse stroombron is die op grote schaal en met het juiste kader kan worden ingezet en concurrerend kan zijn. met kolen- en gascentrales.”
  7. forum rang 10 voda 10 september 2021 08:13
    Investeer meer in waterstof
    9 sept   20:00

    Groene waterstof is essentieel om de vervuilende industrie in Nederland te verduurzamen. Tata Steel, Dow Chemical en kunstmestproducent Yara. Het zijn zo maar wat namen van grote industriële bedrijven uit de lange lijst die in de rij staan voor deze energiedrager, zodat hun fabrieken niet langer op fossiele brandstoffen hoeven te draaien.

    Maar de investering in een groene waterstoffabriek rekent zich op dit moment niet rond. Het is een van de duurste duurzame technieken, waar bovendien nog weinig ervaring mee is. Duitsland en Frankrijk trekken om die reden de portemonnee. Deze landen steken respectievelijk €9 mrd en €7 mrd in waterstofprojecten. De bijdrage van de Nederlandse overheid voor de ontwikkeling van waterstof in ons eigen land steekt daar schril bij af. Ongeveer €100 mln zegde het demissionaire kabinet Rutte-III toe. De grootste bijdrage, €73 mln, komt uit het Nationaal Groeifonds.

    Reden voor energiebedrijf Ørsted, eigenaar van meerdere windparken in de Noordzee, om de politiek te waarschuwen. Het Deense concern wil een waterstoffabriek bouwen in Zeeland, maar dan moet er wel meer overheidssteun beschikbaar zijn, zei ceo Mads Nipper deze week in een interview met het FD.

    Nipper maakt een terecht punt. Nederland is erg voorzichtig met investeringen in groene waterstof. De commissie van het Nationaal Groeifonds zei bij toekenning van de subsidiebedragen dat het 'verdienpotentieel' van grote groene waterstoffabrieken 'niet goed aantoonbaar is'. Daarom adviseert het Groeifonds het kabinet alleen geld te investeren in onderzoeksprogramma's en kleine pilots.

    Dat is een begin, maar er mag best een tandje bij. Want nu investeren betekent dat pas over tien of vijftien jaar waterstoffabrieken draaien. Nu beginnen is dus belangrijk. Nederland hoeft als klein land niet zoveel te investeren als Duitsland of Frankrijk, maar miljardensteun aan één of twee grote groene waterstofprojecten helpt met het opbouwen van de noodzakelijke kennis.

    Veel alternatieven voor het verduurzamen van de industrie zijn er niet. Vanuit dat perspectief is de som vrij helder te maken. Want waar het nog niet goed duidelijk is hoeveel geld Nederland zal kunnen verdienen met groene waterstof, is het wel duidelijk dat olie, steenkool en aardgas uiteindelijk niets meer zullen bijdragen aan de Nederlandse economie.

    Lees het volledige artikel: fd.nl/opinie/1411981/investeer-meer-i...
  8. forum rang 10 voda 16 september 2021 08:47
    EU OYSTER Consortium Chooses Grimsby for Hydrogen Project

    Strategic Research Institute
    Published on :
    16 Sep, 2021, 6:30 am

    Grimsby has been chosen as the location for an innovative "marinised" electrolyser project for renewable hydrogen production. The Fuel Cells and Hydrogen Joint Undertaking, FCH JU, funded OYSTER project will develop and demonstrate an electrolyser system designed to be integrated with offshore wind turbines. The project will also investigate the potential of using pipelines to transport hydrogen to shore.

    Renewable hydrogen is rapidly emerging as a key tool in the green transformation, providing a clear green path forward for many sectors that would otherwise be difficult to decarbonise, such as heavy industry and heavy transport. Developing offshore hydrogen production, by utilising electrolysers which only require water and renewable electricity to generate renewable hydrogen, further increase this potential by providing a means of transporting low-cost renewable energy from areas of excellent resource to demand centres.

    Reaching the EU Hydrogen Strategy target of 40GW of electrolysers by 2030 is expected to require both onshore and offshore electrolysers. The OYSTER project - being undertaken by a consortium of ITM Power, Ørsted, Siemens Gamesa Renewable Energy, and Element Energy - will develop and test a megawatt-scale, fully marinised electrolyser in a shoreside pilot trial, which will be located in Grimsby. The project will also explore the feasibility and potential of combining an offshore wind turbine directly with an electrolyser and transporting renewable hydrogen to shore. The project is 100% funded by the FCH JU, a public private partnership of the European Commission, who awarded the project EUR 5 million in January 2021

    The OYSTER consortium selected Grimsby because of the region's strong connection to renewable energy, in particular offshore wind. Grimsby is home to the O&M hub for Ørsted's UK East Coast operations, including Hornsea One and Hornsea Two, which will be the world's largest offshore wind farm when completed in 2022. Both offshore wind farms use Siemens Gamesa turbines and are fitted with blades manufactured in Hull. The Humber is also home to Gigastack which is developing a blueprint for the deployment of industrial-scale renewable hydrogen from offshore wind. The Gigastack project is led by a separate consortium, consisting of ITM Power, Ørsted, Element Energy and Phillips 66 Limited.

    Due to the high density of energy intensive industries such as refineries, power stations, steel works and glassworks that flank the banks of the Humber, the region is the UK's largest industrial cluster by carbon dioxide emissions; 12.4MtCo2/yr. Decarbonisation of the Humber is vital for the UK's legally binding net-zero 2050 target as well as the future economy of the Humber, and renewable hydrogen coupled with offshore wind could play a central role in achieving this ambition.

    To realise the potential of offshore hydrogen production, there is a need for compact electrolysis systems that can withstand harsh offshore environments and have minimal maintenance requirements while still meeting cost and performance targets that will allow production of low-cost hydrogen. The OYSTER project will provide a major advance towards this aim.

    The OYSTER electrolyser system will be designed to be compact, to allow it to be integrated with a single offshore wind turbine, and to follow the turbine's production profile. Furthermore, the electrolyser system will integrate desalination and water treatment processes, making it possible to use seawater as a feedstock for the electrolysis process.

    ITM Power is responsible for the development of the electrolyser system and the electrolyser trials, while Ørsted will lead the offshore deployment analysis, the feasibility study of future physical offshore electrolyser deployments, and support ITM Power in the design of the electrolyser system for marinisation and testing. Siemens Gamesa Renewable Energy and Element Energy are providing technical and project management expertise.
  9. forum rang 10 voda 17 september 2021 08:17
    Orsted & T&T Sign MoU for Offshore Wind Projects in Vietnam

    Strategic Research Institute
    Published on :
    17 Sep, 2021, 6:30 am

    Orsted and Vietnamese T&T Group announced the signing of a memorandum of understanding to launch a strategic collaboration on offshore wind in Vietnam. The collaboration between Ørsted and T&T brings together a multi-GW pipeline of greenfield offshore wind projects located off the coasts of the Binh Thuan and Ninh Thuan provinces, Vietnam's most suitable areas for offshore wind development. Both partners will apply their groups' joint capabilities to mature this offshore wind pipeline and work to support the development of an effective regulatory framework for offshore wind and a vibrant new industry in Vietnam.

    With more than 3,200 km of coastline and high consistent wind speeds, Vietnam has some of the best conditions for developing offshore wind in Asia. The World Bank Group estimates Vietnam's offshore wind potential to be up to 500 GW. In addition to this world-class potential, Vietnam's rapidly growing demand for power means there is an urgent need for new large-scale reliable power sources in the coming decades. These factors, in combination with Vietnam's strong supply chain potential, have convinced Ørsted and T&T Group that offshore wind has a central role to play in Vietnam's future power mix.
  10. Joni-2 20 september 2021 08:45
    20-09-2021 | 02:30 uur EDT

    REWE Groep, een van Duitslands toonaangevende voedingsdistributeurs, heeft een 10-jarige overeenkomst voor de aankoop van stroom met Ørsted ondertekend voor de aankoop van 100 MW groene elektriciteit van het Borkum Riffgrund 3 offshore windpark van Ørsted, dat in 2025 operationeel zal worden.

    De overeenkomst met Ørsted, die sinds 2008 elektriciteit uit hernieuwbare energiebronnen heeft ingekocht, vertegenwoordigt de grootste overeenkomst voor de afname van hernieuwbare energie van de REWE Group tot nu toe en maakt REWE Groep de eerste Duitse voedingsretailer die elektriciteit koopt van een offshore windpark in de Noordzee.

    De 100 MW groene stroom van Borkum Riffgrund 3 staat gelijk aan het stroomverbruik van 1.500 REWE winkels. REWE Groep heeft als doel om in 2040 klimaatneutraal te zijn.

    “Ons doel is om tegen 2040 klimaatneutraal te zijn”, zegt Lionel Souque, CEO van REWE Groep. “Het is natuurlijk een ambitieus doel. Maar het is ook een doel dat we zullen bereiken. We moeten dit bereiken omdat energie een strategische rol speelt in ons bedrijf: we zijn een pionier op het gebied van groene stroom in de Duitse levensmiddelendetailhandel. Onze winkels maken sinds 2008 volledig gebruik van stroom opgewekt uit hernieuwbare bronnen. Offshore windenergie heeft een enorm potentieel. We zetten weer een stap richting klimaatneutraliteit door gebruik te maken van de eerste groene stroom opgewekt uit deNoordzee.”

    De stroomafnameovereenkomst met Ørsted is ondertekend en zal worden beheerd door EHA Energie-Handels-Gesellschaft, de energie-inkooptak van de REWE Group.

    Jan-Oliver Heidrich, Managing Director van EHA, voegde toe: “Door de overeenkomst voor de aankoop van elektriciteit met het nieuwe windpark te ondertekenen, REWE Groep bevordert direct het uitgebreide gebruik van hernieuwbare energiebronnen, neemt procesverantwoordelijkheid op zich en speelt een nog actievere rol in de energietransitie.”

    Bij Ørsted, de wereldleider in offshore wind, juicht Rasmus Errboe, Head of Region Continental Europe, toe REWE groep ter ondersteuning van de transitie van fossiele naar groene energie:

    “De wereld moet dringend overschakelen op hernieuwbare energie om de CO2-uitstoot te verminderen. Om deze systeemverandering te realiseren is actie nodig van overheden, energieleveranciers en zakelijke energieklanten.REWE Groep heeft een lange traditie in het kopen van duurzame stroom, en door stroom te kopen van Borkum Riffgrund 3 ondersteunen ze de uitbouw van betaalbare nieuwe hernieuwbare energie op industriële schaal.”

    Meer dan tien jaar geleden begon Ørsted met een ambitieuze transformatie, van een van Europa's meest steenkoolintensieve energiebedrijven naar een wereldleider in offshore windenergie en uitgeroepen tot het meest duurzame energiebedrijf ter wereld door Zakelijke Ridders in 2019, 2020 en 2021. Tegen 2030 wil Ørsted 50 GW aan hernieuwbare energiecapaciteit wereldwijd installeren, inclusief 30 GW offshore wind en 17,5 GW onshore wind en zon-PV.

    Feiten over Borkum Riffgrund 3

    Borkum Riffgrund 3 zal naar verwachting in 2025 operationeel worden, onder voorbehoud van de definitieve investeringsbeslissing van Ørsted, die tegen eind 2021 wordt verwacht.

    Borkum Riffgrund 3 heeft een totale exportcapaciteit van 900 MW en wordt gebouwd in de Duitse Noordzee dicht bij de bestaande offshore windparken Borkum Riffgrund 1 en Borkum Riffgrund 2 van Ørsted.

    Op de Duitse offshore windveilingen kreeg Ørsted het recht om het project te bouwen met een bod van EUR 0 per MWh. Dit werd mogelijk gemaakt door een aantal kostendrijvers, waaronder de installatie van de volgende generatie windturbinetechnologie, zeer goede locatie omstandigheden en hoge windsnelheden, en verwachte inkomsten stabiliserende stroomafnameovereenkomsten met industriële klanten zoals REWE Groep.

    cc: marketscreener.com

    In december 2020 heeft Amazon.com reeds een 10-jarige PPA getekend met Ørsted om 250 MW stroom af te nemen van het Borkum Riffgrund 3-project.
  11. Joni-2 20 september 2021 18:09
    Orsted heeft de 227MW Muscle Shoals-zonneboerderij in de Amerikaanse staat Alabama voltooid.

    Het project, dat zich in Colbert County bevindt, heeft een langetermijnovereenkomst voor de aankoop van stroom voor de Tennessee Valley Authority (TVA).

    Het ondersteunt de duurzaamheidsdoelstellingen van het datacenter van Facebook in Huntsville, Alabama, dat net is gestart.

    Orsted heeft Muscle Shoals in 2020 overgenomen van Longroad Energy en heeft 1,4 GW aan zonne- en opslagcapaciteit in gebruik en in aanbouw.

    Orsted onshore chief commercial officer Vishal Kapadia zei: “We zijn erg verheugd om onze hoogwaardige, diverse klantenbasis uit te breiden door middel van deze langdurige samenwerking met TVA en Facebook.

    "De acquisitie en voltooiing van Muscle Shoals vertegenwoordigt de voortdurende succesvolle uitvoering van onze expansiestrategie waarin we onze kernactiviteiten voor greenfield-ontwikkeling op de kernmarkt willen aanvullen met opportunistische acquisities in nieuwe markten om onze portfolio te diversifiëren."

    TVA senior vice president commerciële energieoplossingen Doug Perry zei: “Dit zonnepark is een historisch moment in de geschiedenis van TVA.

    “Het is het eerste Green Invest-project dat online komt en het toont de waarde aan van TVA's focus op schonere energie.

    "Green Invest helpt ons bij het bouwen van het schone, goedkope energiesysteem van de toekomst dat essentieel is om onze milieudoelstellingen te bereiken en te strijden om banen in de nieuwe schone economie."

    cc: renews.biz
  12. Joni-2 21 september 2021 08:44
    Orsted en het Duitse energiebedrijf Uniper zijn een strategisch partnerschap aangegaan om samen op grote schaal offshore wind met waterstof te ontwikkelen.

    Dit moet met name worden bereikt door een systeemgerichte directe integratie van waterstofproductie uit offshore windenergie op een locatie in Wilhelmshaven.

    Uniper begon in 2020 met de ontwikkeling van het groene waterstofproject Wilhelmshaven.

    Naar verwachting zal vanaf 2025 een elektrolyse-installatie met een capaciteit van 70 MW worden geïnstalleerd, die in 2030 wordt uitgebreid tot 410 MW.

    De hernieuwbare elektriciteit die nodig is voor de elektrolyse zal naar verwachting afkomstig zijn van offshore windturbines van Orsted.

    Transportnetbeheerder TenneT gaat ook samenwerken om het duo te ondersteunen bij het transport van windenergie van zee naar land.

    Uniper Hydrogen-topman Axel Wietfeld zei: "Duitsland en Europa moeten sterke industriële locaties blijven - en tegelijkertijd de ambitieuze doelstellingen voor klimaatbescherming behalen. Hiervoor hebben we 'groene elektronen' en 'groene moleculen' nodig.

    “Door de strategische samenwerking met Orsted hebben we precies de juiste opzet om economische en ecologische doelen direct ter plaatse in Wilhelmshaven te combineren.

    "Door offshore wind en waterstof te integreren, kunnen we industrieën zoals de chemische, staal- of transportsector aanzienlijk ondersteunen bij het koolstofvrij maken."

    Jorg Kubitza, algemeen directeur van Orsted Duitsland, zei: "Groene waterstof uit offshore windenergie is de motor van de Duitse decarbonisatie, omdat het een sleutelrol speelt voor toekomstige klimaatneutraliteit.

    “Daarom heeft Duitsland als industriële locatie veel meer groene stroom nodig dan eerder gepland.

    "Ik ben erg blij dat we in Uniper een partner aan onze zijde hebben die samen met ons de opwekking van hernieuwbare offshore windenergie zal blijven stimuleren en promoten om de Duitse klimaatdoelstellingen te kunnen halen."

    TenneT chief operating officer Tim Meyerjurgens: “Geïntegreerde planning van elektriciteit en waterstof wordt de belangrijkste factor in een succesvolle energietransitie.

    “Elektrolyse moet plaatsvinden daar waar hernieuwbare energie wordt opgewekt en in voldoende hoeveelheden beschikbaar is, namelijk vooral aan de kust. Als betrouwbare partner in het vormgeven van de energietransitie staat TenneT klaar om Ørsted en Uniper te ondersteunen bij hun ambitieuze doelen.”


    Wilhelmshaven zou kunnen uitgroeien tot een waterstofcentrum voor Nedersaksen en als voorbeeld dienen voor soortgelijke projecten, aldus de partners.

    Daarnaast onderzoeken Uniper en Orsted CO2-vrije alternatieven voor het stabiliseren van elektriciteitsnetten, evenals groene oplossingen voor industriële klanten met een hoge mate van leveringszekerheid - zelfs in het geval van mogelijke donkere periodes.

    cc: renews.biz
  13. Joni-2 22 september 2021 08:30
    Orsted heeft zijn voornemen bekendgemaakt om in de komende decennia tot £ 12 miljard rechtstreeks met Schotse bedrijven te investeren in de ontwikkeling en bouw van offshore windparken in het land.

    Deze voorstellen zijn vervat in biedingen die zijn ingediend bij Crown Estate Scotland via de ScotWind-huurronde voor offshore windenergie en zouden meer dan 8,5 GW aan schone, hernieuwbare elektriciteit opleveren als de biedingen van Orsted slagen.

    Het bedrijf heeft biedingen ingediend voor in totaal vijf projecten; twee drijvende biedingen voor alleen wind, als onderdeel van zijn joint venture-partnerschap met BlueFloat Energy en Falck Renewables, en nog eens drie als Orsted alleen, die een mix van vaste en drijvende windtechnologieën omvatten.

    Orsted Chief Commercial Officer Martin Neubert zei: "We hebben ons gecommitteerd aan deze ambitieuze plannen voor de ScotWind-leaseronde, niet alleen omdat Schotland een sleutelrol kan spelen bij het bereiken van onze ambitie, maar omdat we er vast van overtuigd zijn dat onze schaal en ervaring in offshore wind ons in een unieke positie plaatst." positie om Schotland zo snel mogelijk te helpen bij de overgang naar een koolstofarme economie.

    "Door grootschalige offshore windopwekking op te nemen naast hernieuwbare waterstof en groene brandstoffen om moeilijk te verminderen sectoren in de zware industrie en transport koolstofarm te maken, zullen we een echt geïntegreerde decarbonisatie-oplossing creëren die goedkope, hernieuwbare energie levert.

    "We zijn van mening dat onze biedingen een belangrijke bijdrage leveren aan het behalen van de ambitieuze doelstellingen voor klimaatverandering van Schotland en generaties lang de duurzame energie-economie van het land zullen ondersteunen."


    Duncan Clark, hoofd van de regio UK voor Orsted, zei dat het bedrijf ernaar uitkijkt om de "tientallen jaren ervaring" van Orsted in te zetten om de groei van de offshore windindustrie en zijn toeleveringsketen in Schotland te ondersteunen.

    Dit omvat een verbintenis om samen te werken met Schotse havens en leveranciers om infrastructuur en een toeleveringsketen te ontwikkelen die Schotland in staat zal stellen zich te vestigen als een toonaangevende speler op de wereldwijde offshore windmarkt.

    Hij zei: “Schotland heeft ongetwijfeld enkele van de beste offshore windbronnen ter wereld.

    “De ScotWind-leaseronde is een cruciaal moment voor de ontwikkeling van de offshore-windsector in Schotland, waarbij wordt geprofiteerd van het uitstekende offshore-windpotentieel en de toonaangevende offshore-engineering- en contractmogelijkheden, waardoor investeringen worden vrijgemaakt die banen en kansen zullen creëren voor Schotse bedrijven voor generaties. .”

    Drijvende wind is de sleutel tot de voorstellen van Orsted, waarbij drijvende funderingen op grote schaal worden ingezet naast turbines met vaste bodem.

    Deze drijvende offshore-windprojecten zouden op een versnelde tijdlijn worden ontwikkeld om groene stroom voor Schotland te leveren en maken deel uit van een geïntegreerde strategie om Schotland's drijvende windportfolio op te bouwen, naarmate de technologie zich ontwikkelt, naast de drijvende windprojecten op gigawattschaal die we naast voorstellen Falck Renewables en BlueFloat Energy.

    Orsted is van plan om duurzame waterstofprojecten in Schotland te ontwikkelen met een deel van de elektriciteit van de voorgestelde offshore windparken.

    cc: renews.bis
  14. Joni-2 22 september 2021 08:36
    Ørsted, en Williams onderzoeken het Amerikaanse wind-, elektrolyse- en synthetisch gasproject

    (PLX AI) - Ørsted en Williams bundelen hun krachten om mogelijkheden voor schone energie in de VS te verkennen

    • De bedrijven onderzoeken een grootschalige ontwikkeling van windenergie, elektrolyse en synthetisch gas via methanatie in Wyoming, waar Williams een aanzienlijk landoppervlak en aardgasinfrastructuur bezit

    • Ørsted wil onshore-activiteiten mogelijk omvormen tot een groeiplatform voor hernieuwbare waterstof

    cc: finanznachrichten.de
  15. forum rang 10 voda 29 september 2021 08:47
    Orsted Completes Muscle Shoals Solar Project in Alabama

    Strategic Research Institute
    Published on :
    29 Sep, 2021, 6:30 am

    Ørsted continues to expand its solar footprint across the US and has completed the 227 MWAC Muscle Shoals solar PV project in Colbert County in Alabama. Located in the Tennessee Valley Authority service area, the project has a long-term PPA with TVA. This new project will support the sustainability goals of Facebook's data center in Huntsville, Alabama that just started operations.

    Ørsted acquired Muscle Shoals in 2020 from Longroad Energy and has 1.4 GW of solar and storage capacity in operation and under construction.
  16. Joni-2 29 september 2021 13:49
    Keppel Offshore & Marine uit Singapore heeft de bouw van twee offshore substations voor offshore windreus Ørsted voltooid.

    De twee onbemande 600 MW offshore windpark-substations zullen worden ingezet in de Greater Changhua 1 & 2a offshore windparken in Taiwan.

    De topside-modules, die een gecombineerd gewicht hebben van meer dan 8000MT, zullen naar verwachting eind oktober 2021 wegvaren om te worden geïntegreerd met de jacket-funderingen ter plaatse in de Straat van Taiwan.

    Keppel O&M rondde eerder in Q2 2021 de bouw van de jacket-funderingen af ??en zal de integratiewerkzaamheden voor de offshore substations uitvoeren.

    Na integratie van de topside-modules op de jacket-funderingen, zal Keppel O&M het testen van de onderstationsystemen uitvoeren.

    De offshore-substations zijn naar verwachting bestand tegen de zee en extreme weersomstandigheden op de locatie en zullen de energie die wordt opgewekt door het offshore windpark via onderzeese kabels naar het onshore-substation distribueren.
    De Changhua 1 & 2a offshore windparken, 35-50 kilometer uit de kust van Changhua County, zullen ongeveer 1 miljoen huishoudens in Taiwan van elektriciteit voorzien.

    Wanneer ze operationeel zijn, zullen de Greater Changhua 1 & 2a de eerste verre kust en grootschalige offshore windparken van Taiwan zijn.

    Chris Ong, CEO van Keppel O&M zei: “Keppel O&M's spil naar hernieuwbare energie heeft aan kracht gewonnen, met een waarde van S$ 1,3 miljard aan offshore windprojecten in de afgelopen drie jaar. We hebben de capaciteiten om oplossingen te ontwikkelen in de waardeketen van offshore hernieuwbare energiebronnen en om R&D te doen voor andere oplossingen voor het koolstofvrij maken, zoals waterstof, ammoniak en elektrificatie. Dit is in lijn met Keppel's Vision 2030, waarin duurzaamheid centraal staat in de strategie van het bedrijf."

    cc: oedigital.com
  17. Joni-2 29 september 2021 13:52
    De offshore windontwikkelaar Ørsted heeft een milieurapport ingediend voor het 1,5 GW Skåne Havsvindpark windparkproject voor de kust van Zweden.

    De indiening van het rapport werd voorafgegaan door onderzoeken en een grondige milieueffectrapportage (MER), aldus de ontwikkelaar.

    Het offshore windmolenpark Skåne is gepland in de Baltische Zee, ongeveer 22 kilometer ten zuiden van Skåne, en kan voldoende hernieuwbare elektriciteit produceren om de helft van Skåne's huidige elektriciteitsbehoefte te dekken.

    Het projectgebied beslaat 450 vierkante kilometer waar de omstandigheden voor windenergie erg goed zijn en de aanvraag voor netaansluiting al vele jaren geleden is gedaan, zei Ørsted.

    "De vooruitzichten voor offshore windenergie in Zweden zijn ongelooflijk opwindend, en als alles goed gaat, zijn we klaar om tientallen miljarden kronen te investeren in Skåne Havsvindpark", zegt Peter Obling , Head of Markets and Commercial voor de regio Continentaal Europa bij Ørsted. .

    ”Er zal dringend behoefte zijn aan duurzame elektriciteit in Zuid-Zweden. Skåne Havsvindpark, dat groter zal zijn dan enig ander maritiem park dat vandaag in bedrijf is, kan een belangrijke bron van schone elektriciteit zijn en kan op tijd worden gerealiseerd om te voldoen aan de behoeften van de energie-intensieve Zweedse industrie, de transportsector en de samenleving als geheel. ”

    De voltooiing van het EIA-rapport is een belangrijke mijlpaal voor het doel van Ørsted om grootschalige offshore windenergie te leveren aan Zweedse huizen en bedrijven, aldus het bedrijf. Het rapport beschrijft de impact van het project op het milieu en welke inspanningen Ørsted zal leveren om dit aan te pakken, in lijn met de ambitie van het bedrijf om tegen 2030 een netto positief effect te creëren op de biodiversiteit van al zijn nieuwe hernieuwbare energieprojecten.

    ”Het voelt heel goed om het milieueffectrapport in te dienen, waar we veel werk en energie in hebben gestoken. We wachten nu op het standpunt van de autoriteiten. We gebruiken de tijd om onze contacten en samenwerking met de omgeving en het bedrijfsleven in de buurt, met potentiële leveranciers en andere geïnteresseerden verder uit te bouwen. Een project van deze omvang is complex en vereist een langetermijnengagement”, zegt Beatrice Teurneau , Ørsted Senior Market Developer voor offshore windenergie in Zweden.

    Het Oostzeegebied heeft het potentieel voor meer dan 90 GW aan offshore windenergie, waarvan Zweden 20 GW voor zijn rekening neemt, zei Ørsted.

    Naast het Skåne-project ontwikkelt Ørsted ook het Gotland offshore windpark in Zweden. Dit project zal ook een capaciteit hebben van maximaal 1.500 MW. Het windpark ligt zo'n tien kilometer ten zuidwesten van Gotland en heeft een oppervlakte van zo'n 370 vierkante kilometer. Ook dit project ondergaat een milieubeoordeling.
  18. Joni-2 29 september 2021 14:59
    Orsted A/S: De Europese Investeringsbank steunt Ørsted met een leningsovereenkomst van € 500 miljoen, voor haar stimulatie van groene energie

    09/29/2021 | 02:52 uur EDT

    "We zijn erg blij met de inzet van de EIB en de sterke steun die ze tonen voor de investeringen van Ørsted in de windparken Borssele 1 & 2 en hernieuwbare energie in het algemeen. Met deze lening heeft Ørsted zich verzekerd van langetermijnfinanciering voor het project, dat is een belangrijke factor om te slagen met onze ambitie om 's werelds toonaangevende grote speler op het gebied van groene energie te worden", zegt vice-president Kasper Kiim Jensen, hoofd Treasury & Capital Planning bij Ørsted.

    "De EIB heeft een lange geschiedenis als het gaat om de financiering van windenergie, van de R&D van de technologie tot de turbines, evenals enkele van de grootste windparken in Europa, wat uiteindelijk helpt om de prijzen voor windenergie te verlagen," zei EIB-vicevoorzitter Kris Peeters. "Hernieuwbare energie zal steeds belangrijker worden naarmate we op weg zijn naar volledige decarbonisatie. De EIB blijft zich inzetten voor de financiering van deze transitie en is verheugd de rol van Ørsted hierin financieel te ondersteunen."

    De 752 MW Borssele 1 & 2 windparken tellen 94 windturbines die, door middel van inter-array bekabeling, hun energie overbrengen naar een offshore substation voordat ze het net bereiken via een hoogspanningslijn die de EIB eerder hielp financieren met TSO TenneT.

    Over de Europese Investeringsbank:
    De Europese Investeringsbank (EIB) geeft namens de Europese Unie langlopende leningen uit. De Bank is rechtstreeks eigendom van de EU-lidstaten - Nederland bezit 5,2% van de aandelen - en kan daardoor zeer goedkope leningen verstrekken op de kapitaalmarkt. Hierdoor kan de EIB lange termijnfinanciering verstrekken voor solide investeringen die bijdragen aan de beleidsdoelstellingen van de EU. De EIB heeft in 2020 circa 1,9 miljard euro aan leningen beschikbaar gesteld voor projecten in Nederland.

    Over Ørsted
    De visie van Ørsted is een wereld die volledig draait op groene energie. Ørsted ontwikkelt, bouwt en exploiteert offshore en onshore windparken, zonneparken, energieopslagfaciliteiten en bio-energiecentrales, en levert energieproducten aan haar klanten. Ørsted is 's werelds meest duurzame energiebedrijf in de Corporate Knights' 2021-index van de 100 meest duurzame bedrijven ter wereld en staat op de CDP Climate Change A List als wereldleider op het gebied van klimaatactie. Ørsted heeft zijn hoofdkantoor in Denemarken en stelt 6.472 mensen tewerk. De aandelen van Ørsted zijn genoteerd aan Nasdaq Copenhagen (Orsted). In 2020 bedroeg de omzet van de groep DKK 52,6 miljard (7,1 miljard EUR).
  19. forum rang 10 voda 30 september 2021 09:23
    REWE & Orsted Sign PPA for future German Offshore Wind Farm

    Strategic Research Institute
    Published on :
    30 Sep, 2021, 6:30 am

    One of Germany's leading food retailers REWE Group has signed a 10-year power purchase agreement with Ørsted to procure 100 MW of green electricity from Ørsted's Borkum Riffgrund 3 offshore wind farm which is set to become operational in 2025. Having procured electricity from renewable energy sources since 2008, the agreement with Ørsted represents REWE Group's largest renewable energy offtake agreement to date and makes REWE Group the first German food retailer to purchase electricity from an offshore wind farm in the North Sea.

    The 100 MW of green power from Borkum Riffgrund 3 equals the power consumption of 1,500 REWE stores. REWE Group has a goal of becoming climate neutral by 2040.

    The power purchase agreement with Ørsted was signed and will be managed by EHA Energie-Handels-Gesellschaft, REWE Group's energy procurement arm.

    Facts about Borkum Riffgrund 3

    Borkum Riffgrund 3 is expected to become operational in 2025, subject to Ørsted's final investment decision, which is expected by the end of 2021.

    Borkum Riffgrund 3 will have a total export capacity of 900 MW and will be built in the German North Sea close to Ørsted's existing offshore wind farms Borkum Riffgrund 1 and Borkum Riffgrund 2.

    In the German offshore wind auctions, Ørsted was awarded the right to build the project with a bid of EUR 0 per MWh. This was made possible by a number of cost drivers, including the installation of next-generation wind turbine technology, very good site conditions and high wind speeds, and anticipated revenue-stabilising power purchase agreements with industrial customers such as REWE Group.
546 Posts
Pagina: «« 1 ... 16 17 18 19 20 ... 28 »» | Laatste |Omhoog ↑

Meedoen aan de discussie?

Word nu gratis lid of log in met je emailadres en wachtwoord.