Ontvang nu dagelijks onze kooptips!

word abonnee
IEX 25 jaar desktop iconMarkt Monitor

Grondstoffen« Terug naar discussie overzicht

Ivanhoe Mines: een metaalgigant in wording

243 Posts
Pagina: «« 1 ... 5 6 7 8 9 ... 13 »» | Laatste | Omlaag ↓
  1. [verwijderd] 13 mei 2021 15:58
    quote:

    DeZwarteRidder schreef op 13 mei 2021 14:34:

    Wat levert 200.000 ton aan koper per jaar op....???
    Ja reken dat is uit en dan zo n 40% voor IVN.

    OWNERSHIP:
    Ivanhoe Mines (39.6%)
    Zijin Mining Group (39.6%)
    Government of the DRC (20%)
    Crystal River Global (0.8%)
    STAGE:
    First production expected
  2. forum rang 10 DeZwarteRidder 15 mei 2021 08:22
    New bull chart for $30,000 copper price: porphyries nearly mined out
    Frik Els | May 14, 2021 | 12:05 pm Intelligence Markets Australia Canada Latin America USA Copper
    New bull case for $30,000 copper price: porphyries nearly mined out
    Bad moon rising over porphyry deposits. Radomiro Tomic, Chile. Image from Codelco.

    Predictions for copper at double or triple today’s level is a fairly recent phenomenon – and bears still outnumber bulls as to what’s next for the bellwether metal.

    Wall Street natural resource investment house Goehring & Rozencwajg Associates confirmed their place in the superbull camp this week, predicting a copper price north of $30,000:

    “The previous copper bull market took place between 2001 and 2011 and saw prices rise seven-fold: from $0.60 to $4.62 per pound. The fundamentals today are even more bullish.

    “We would not be surprised to see copper prices again advance a minimum of seven-fold before this bull market is over. Using $1.95 as our starting point, we expect copper prices to potentially peak near $15 per pound by the latter part of this decade.”

    The rosy demand side for copper has been well documented and Goehring & Rozencwajg focuses on supply, specifically depletion in their latest commentary.

    Depletion, surprisingly, is not discussed that often in the industry and according to the authors is little understood, despite its fundamental importance for long-term supply trends.

    Low and declining grades, uninspiring green and brownfield discoveries (with a few exceptions) and thin, slow project pipelines have become rules of thumb in the copper mining industry.

    To those issues, the report adds copper miners’ habit of high-grading (mining your best quality ore first) and growing your reserves with a simple ploy – lowering cut-off grades when prices rise.

    Even with prices well above $10,000 a tonne, these paper reserves cannot keep growing, according to Goehring & Rozencwajg, specifically at porphyry deposits which produce 80% of the world’s copper.

    The authors have calculated an industry average cut-off grade of 0.25%, down from 0.4% in the mid-2000s when the firm first started tracking producers’ reserve calculations at 115 mines across the globe responsible for four-fifths of total output.

    “The copper industry’s ability to increase its reserve base by lowering its cut-off grade is nearing an end, regardless of how high copper prices go. It is a complicated but very important subject based on how copper porphyry deposits are geologically formed.

    “Lowering the cut-off grade clearly cannot go on indefinitely; unlike interest rates there is a firm low at zero. More important, the log-normal shape of the grade-tonnage plot means that most of the reserves have likely already been added.

    “Most reserves are located on the right side of the mean where the grade-tonnage curve has a long tail. On the left hand side of the mean, the log-normal distribution shows that the grade-tonnage curve has a very short tail with far few reserves.”
  3. [verwijderd] 15 mei 2021 08:41
    quote:

    DeZwarteRidder schreef op 15 mei 2021 08:24:

    [...]

    Wie kan uitrekenen hoeveel geld dit oplevert....???
    weet jij zelf ook wel als je rekent met aisc$1,25 per pond(ruim genomen).

    zullen er best nog verdere kosten en belastingen bijkomen.

    iig money machine voor vele jaren door electrificatie wereldwijd en stijgende copper price.

    Grote nieuwe high grade projecten duren 15 tot 20 jaar,als ze al gevonden worden,van vondst tot productie dus IVN gaat zeer goede toekomst tegemoet.

    En dan hebben ze ook nog WESTERN FORELAND copper project als mogelijk toekomstige gigant.
  4. forum rang 10 DeZwarteRidder 15 mei 2021 09:08
    quote:

    easy56 schreef op 15 mei 2021 08:41:

    [...]weet jij zelf ook wel als je rekent met aisc$1,25 per pond(ruim genomen).

    zullen er best nog verdere kosten en belastingen bijkomen.

    iig money machine voor vele jaren door electrificatie wereldwijd en stijgende copper price.

    Grote nieuwe high grade projecten duren 15 tot 20 jaar,als ze al gevonden worden,van vondst tot productie dus IVN gaat zeer goede toekomst tegemoet.

    En dan hebben ze ook nog WESTERN FORELAND copper project als mogelijk toekomstige gigant.
    Ik vroeg niet wat de kosten zijn, maar wat het oplevert.
  5. [verwijderd] 25 mei 2021 20:06
    quote:

    easy56 schreef op 25 mei 2021 16:51:

    produktie komt dichterbij en mischien realiseren beleggers zich dat deze 3 assets tot de beste terwereld behoren.

    En mischien eindelijk ook beursnotering Azie of Londen.

    Afsplitsing Platreef?

    Afwachten,veel mogelijk.

    komt ook in msci index vrijdag,maar dat is al tijdje bekend
  6. forum rang 4 Housepartyy 26 mei 2021 15:19
    quote:

    easy56 schreef op 26 mei 2021 12:26:

    Kamoa-Kakula begins concentrate production
    ------------------------------
    Prachtig, nagel nieuwe produktie faciliteit,heeft miljarden gekost en gaan beleggers en medewerkers nog vele decennia van profiteren.

    vimeo.com/555053503/10c1906415
    Vooral medewerkers. Goed om te zien dat Ivanhoe ook garant staat voor werkgelegenheid in de lokale economie.
243 Posts
Pagina: «« 1 ... 5 6 7 8 9 ... 13 »» | Laatste |Omhoog ↑

Meedoen aan de discussie?

Word nu gratis lid of log in met je emailadres en wachtwoord.