Ontvang nu dagelijks onze kooptips!

word abonnee
IEX 25 jaar desktop iconMarkt Monitor

Aandeel TKH Group AEX:TWEKA.NL, NL0000852523

Laatste koers (eur) Verschil Volume
33,260   +0,100   (+0,30%) Dagrange 33,140 - 33,440 24.661   Gem. (3M) 93,9K

TKH 2024: Nieuwe fabrieken af, nu produceren

1.121 Posts
Pagina: «« 1 ... 45 46 47 48 49 ... 57 »» | Laatste | Omlaag ↓
  1. forum rang 5 Lekker Truitje 5 december 2024 16:18
    Autobanden: is het dan bekend onder welke naam die banden dan verkocht worden? Ik ken wel Michelin, Continental en onze Vredestein. Vredestein is dacht ik al lang geleden de produktie gaan verhuizen van Enschede naar India. Maakt Twentsche Kabel dan banden voor zo'n groot merk ?
  2. forum rang 5 The Third Way... 6 december 2024 14:08
    Denmark Receives No Bids in Largest-Ever Offshore Wind Tender
    By Sanne Wass
    December 05, 2024 at 11:56AM EST

    (Bloomberg) -- Denmark received no bids in its largest-ever wind power tender, aimed to more than triple its offshore capacity by the end of the decade.

    The Danish Energy Agency hadn’t received a single bid in a tender for three offshore wind farms in the North Sea by Thursday’s deadline, it said in a statement. It now will initiate a dialog with the market to find out why.

    Denmark’s Climate and Energy Minister Lars Aagaard called the results “very disappointing” and said they were “not at all what was expected” when a broad majority in parliament entered into the political agreement to expand the country’s offshore wind capacity.

    It was the first round in an tender to establish at least 6 gigawatts of wind power at sea in six parks by 2030. Aagaard recognized that the results “do not give rise to great optimism” for the other three farms in the tender, but said there may be “other players and business models at play.” The deadline for these bids is in April.

    Denmark, a country of about 6 million people, is home to some of the world’s largest wind-energy companies, including Vestas Wind Systems A/S and Orsted A/S. The new offshore parks, in which the Danish state would take stakes of 20%, were vital for Denmark to reach its target to become carbon neutral in 2045.

    ©2024 Bloomberg L.P.
  3. G 60. 6 december 2024 14:43
    quote:

    The Third Way... schreef op 6 december 2024 14:08:

    Denmark Receives No Bids in Largest-Ever Offshore Wind Tender
    By Sanne Wass
    December 05, 2024 at 11:56AM EST

    (Bloomberg) -- Denmark received no bids in its largest-ever wind power tender, aimed to more than triple its offshore capacity by the end of the decade.

    The Danish Energy Agency hadn’t received a single bid in a tender for three offshore wind farms in the North Sea by Thursday’s deadline, it said in a statement. It now will initiate a dialog with the market to find out why.

    Denmark’s Climate and Energy Minister Lars Aagaard called the results “very disappointing” and said they were “not at all what was expected” when a broad majority in parliament entered into the political agreement to expand the country’s offshore wind capacity.

    It was the first round in an tender to establish at least 6 gigawatts of wind power at sea in six parks by 2030. Aagaard recognized that the results “do not give rise to great optimism” for the other three farms in the tender, but said there may be “other players and business models at play.” The deadline for these bids is in April.

    Denmark, a country of about 6 million people, is home to some of the world’s largest wind-energy companies, including Vestas Wind Systems A/S and Orsted A/S. The new offshore parks, in which the Danish state would take stakes of 20%, were vital for Denmark to reach its target to become carbon neutral in 2045.

    ©2024 Bloomberg L.P.
    Ze beginnen in te zien dat de green deal veel te duur is .
  4. forum rang 7 White Arrow 6 december 2024 23:46
    quote:

    The Third Way... schreef op 6 december 2024 14:08:

    Denmark Receives No Bids in Largest-Ever Offshore Wind Tender
    By Sanne Wass
    December 05, 2024 at 11:56AM EST

    (Bloomberg) -- Denmark received no bids in its largest-ever wind power tender, aimed to more than triple its offshore capacity by the end of the decade.

    The Danish Energy Agency hadn’t received a single bid in a tender for three offshore wind farms in the North Sea by Thursday’s deadline, it said in a statement. It now will initiate a dialog with the market to find out why.

    Denmark’s Climate and Energy Minister Lars Aagaard called the results “very disappointing” and said they were “not at all what was expected” when a broad majority in parliament entered into the political agreement to expand the country’s offshore wind capacity.

    It was the first round in an tender to establish at least 6 gigawatts of wind power at sea in six parks by 2030. Aagaard recognized that the results “do not give rise to great optimism” for the other three farms in the tender, but said there may be “other players and business models at play.” The deadline for these bids is in April.

    Denmark, a country of about 6 million people, is home to some of the world’s largest wind-energy companies, including Vestas Wind Systems A/S and Orsted A/S. The new offshore parks, in which the Danish state would take stakes of 20%, were vital for Denmark to reach its target to become carbon neutral in 2045.

    ©2024 Bloomberg L.P.
    Summary
    Companies
    Denmark's offshore wind tender fails, attracts no bids
    Auction design does not reflect conditions -analysts
    Economic shifts, rising costs challenge subsidy-free model
    OSLO/COPENHAGEN, Dec 6 (Reuters) - Denmark's failure to attract any bids in an offshore wind power tender this week stems from a rigid auction model, a failure to adapt to a changed economic reality for renewable energy projects and rising competition, analysts said on Friday.
    The outcome was a blow to Denmark, home to turbine maker Vestas and offshore wind developer Orsted (ORSTED.CO), opens new tab, which has been a pioneer in onshore and offshore wind power.
    The tender for at least 3 gigawatts (GW) of capacity in the Danish North Sea offered no subsidies, instead inviting competition for payments over 30 years to the state, which would also own a 20% stake in each of the tendered projects.
    "The way the auction design is made reflects the past market and not the current costs of building offshore wind," said Soren Lassen, head of global offshore wind research at Wood Mackenzie.
    Instead of taking from developers, the Danish government should consider what they can provide them with, he added.
    The Danish system does not offer any subsidies or revenue stabilisation which makes it less attractive for developers compared to similar offshore wind auctions in Poland, the Netherlands and Britain, industry lobby group WindEurope said.
    "Denmark's uncapped negative bidding creates an unhealthy race to the bottom and unnecessarily increases the upfront costs for offshore wind developers," WindEurope said in a statement.
    In addition, Denmark does not pay for the costly grid connection to the offshore wind farms.
    Denmark's Climate and Energy Minister Lars Aagard told Reuters that the conditions for the tender were agreed at a time when market conditions were much more favourable, paving the way to build wind farms at sea with no subsidies.
    In 2021, Denmark's tender for the 1 GW Thor wind farm was so hotly contested by developers willing to pay for the rights, it was decided in a lottery won by Germany's RWE (RWEG.DE), opens new tab.
    However, over the past three years, the offshore wind industry has been hit by surging costs, rising interest rates and supply chain bottlenecks.
    "They are challenged on both the cost side and the revenue side," Aagard said.
    Developers also faced uncertain electricity prices.
    "We have an electricity system that has a lot of renewable energy," said Brian Vad Mathiesen, professor in energy planning and renewable energy systems at Aalborg University.
    "In order to increase that amount you have to redesign consumption patterns," he added.
    Using excess power generated by wind at times when it is not needed by users to produce so-called green hydrogen is one potential solution to the problem, but development has stalled.
    Denmark's latest tender is part of a wider political agreement to install at least 6 GW of new offshore wind capacity by 2030, and making adjustments ahead of further tenders will be complicated, said Rikke Noergaard, chief commercial officer at analysis firm Aegir Insights.
    However, a potential delay to the Danish plans may not be all negative, she added.
    "Just looking at the big developers' pipeline, most of them filled up their pipeline until 2030, but there's a lot of room after 2030," Noergaard said.
    Make sense of the latest ESG trends affecting companies and governments with the Reuters Sustainable Switch newsletter. Sign up here.
    Reporting by Nora Buli in Oslo and Stine Jacobsen in Copenhagen; Editing by Alexander Smith
  5. forum rang 6 de schaatser 7 december 2024 13:38
    quote:

    Knoop schreef op 7 december 2024 10:36:

    Dus ze kunnen niet eens leveren iedereen zit vol tot 2030
    Tkh ook !!??
    Weet iemand of de kabelfabriek in de Eemshaven nu eindelijk eens werkt?
    Uiteindelijk met de afgegeven productie capaciteit en de prijs per strekkende meter, kunnen ze 2,4 miljard euro per jaar halen. De winstprognoses ken ik niet.
    maar goed . kom eerst maar eens op gang. Het eerste stukje verlies wordt ze vergeven . maar dan moet het wel gaan gebeuren.
  6. Hans 7 december 2024 14:03
    quote:

    de schaatser schreef op 7 december 2024 13:38:

    [...]
    Weet iemand of de kabelfabriek in de Eemshaven nu eindelijk eens werkt?
    Uiteindelijk met de afgegeven productie capaciteit en de prijs per strekkende meter, kunnen ze 2,4 miljard euro per jaar halen. De winstprognoses ken ik niet.
    maar goed . kom eerst maar eens op gang. Het eerste stukje verlies wordt ze vergeven . maar dan moet het wel gaan gebeuren.
    Zou ik ook wel willen weten. Voor de lange termijn heb ik er vertrouwen in dus gisteren nog wel flink bijgekocht.
  7. forum rang 7 Dividend Collector 7 december 2024 19:07
    Ik heb eerder een positie in TKH gehad, die ik verkocht heb in januari 2023.

    Gezien de forse onderwaardering ga ik aankomende week weer instappen. Volgend jaar wordt weer een wpa verwacht van minimaal 2,90 euro en dan is een k/w van 10-11 wel heel zuinig voor dit kwaliteitsaandeel.

    TKH heeft momenteel mijn voorkeur boven bijv Aalberts of Signify, hoewel deze bedrijven ook laag staan. In laatstgenoemde heb ik ook al een positie.
  8. forum rang 5 maarten030 8 december 2024 09:32
    quote:

    Dividend Collector schreef op 7 december 2024 19:07:

    Ik heb eerder een positie in TKH gehad, die ik verkocht heb in januari 2023.

    Gezien de forse onderwaardering ga ik aankomende week weer instappen. Volgend jaar wordt weer een wpa verwacht van minimaal 2,90 euro en dan is een k/w van 10-11 wel heel zuinig voor dit kwaliteitsaandeel.

    TKH heeft momenteel mijn voorkeur boven bijv Aalberts of Signify, hoewel deze bedrijven ook laag staan. In laatstgenoemde heb ik ook al een positie.
    Kwaliteitsaandeel? Een duidelijke moat is er niet te vinden.
  9. forum rang 8 Hopper58 8 december 2024 10:58
    Zoveel ongeduld. De problemen in Eemshaven werden nog maar op 12/11 gemeld. In een tekst in fd:

    'Het bedrijf verwacht wel dat de problemen in de Eemshaven in de loop van 2025 zijn opgelost en dat het omzetdoel van €170 mln tot €180 mln op jaarbasis voor de fabriek kan blijven staan.'
  10. forum rang 7 Dividend Collector 8 december 2024 11:29
    quote:

    maarten030 schreef op 8 december 2024 09:32:

    [...]

    Kwaliteitsaandeel? Een duidelijke moat is er niet te vinden.
    Eens, dat woord neem ik terug.

    • Definitie en prestatie van kwaliteitsaandelen: Een kwaliteitsaandeel wordt gedefinieerd als een bedrijf dat gemiddeld gezien meer rendement genereerd dan de algehele markt gedurende een aantal opeenvolgende jaren.
  11. Hans 8 december 2024 13:25
    quote:

    Dividend Collector schreef op 8 december 2024 11:29:

    [...]

    Eens, dat woord neem ik terug.

    • Definitie en prestatie van kwaliteitsaandelen: Een kwaliteitsaandeel wordt gedefinieerd als een bedrijf dat gemiddeld gezien meer rendement genereerd dan de algehele markt gedurende een aantal opeenvolgende jaren.

    misschien geen kwaliteitsaandeel maar wel een kwaliteitsbedrijf.
    De moat van VMI met zijn bandenbouwmachines kan haast niet beter.
  12. forum rang 6 Kruimeldief 8 december 2024 18:59
    quote:

    Hopper58 schreef op 8 december 2024 10:58:

    Zoveel ongeduld. De problemen in Eemshaven werden nog maar op 12/11 gemeld. In een tekst in fd:

    'Het bedrijf verwacht wel dat de problemen in de Eemshaven in de loop van 2025 zijn opgelost en dat het omzetdoel van €170 mln tot €180 mln op jaarbasis voor de fabriek kan blijven staan.'
    Ik aarzel al maanden om in te stappen. Dit helpt niet: “in de loop van” is halverwege een keer?
  13. forum rang 5 K. Wiebes 8 december 2024 19:45
    quote:

    K. Wiebes schreef op 14 september 2024 10:39:

    Nou. Op 't gevaar af dat we over 'n tijdje naar 'n koers van 30, een vólgende SOTP van 60
    en daarmee 'n upside van 100% zitten te koekeloeren geef ik ze, mede wegens de nieuwe
    fabriek en de uitbreiding van hun belang door 'n aantal grote investeerders, nog even het
    voordeel van de twijfel...
    Ik ga zéker, éérst de jaarcijfers afwachten voordat ik weer instap. En helaas heeft de tijd
    geleerd, dat je als belegger niét ál teveel waarde aan hun outlook mag hechten; want die
    wordt keer op keer, om wát voor reden dan ook, niét gehaald.
  14. forum rang 8 Hopper58 10 december 2024 07:55
    quote:

    Hans schreef op 8 december 2024 13:25:

    [...]misschien geen kwaliteitsaandeel maar wel een kwaliteitsbedrijf.
    De moat van VMI met zijn bandenbouwmachines kan haast niet beter.
    Er is eerder een probleem met de kwaliteit van de huidige 'belegger'. Er zullen altijd periodes zijn dat het eens wat minder gaat en dat wordt nu eenmaal gevolgd door de koers.
  15. Speedbox 11 december 2024 09:57
    Dec 10 (Reuters) - RWE AG :
    RWE AND TOTALENERGIES CHOOSE EEMSHAVEN AS TURBINE ASSEMBLY AND CONSTRUCTION BASE FOR JOINT DUTCH OFFSHORE WIND PROJECT ORANJEWIND
    PRE-ASSEMBLY AND OFFSHORE CONSTRUCTION OF TURBINES WILL BE CARRIED OUT FROM BUSS TERMINAL EEMSHAVEN IN 2027

    Neem aan dat TKH de kabels van dit project gaat leveren. Zit ook in RWE vanwege de lage waardering maar die wil ook maar niet omhoog.
  16. Knoop 11 december 2024 20:00
    Windturbinefabrikant Vestas levert voor OranjeWind 53 van hun 15-megawatt (MW) turbines, die ze gedurende de eerste 5 jaar onderhouden, waarna de bouwer lange termijn ondersteuning biedt. Monopile funderingen en componenten als ladders, aanlandingen en toegangs- en interne platforms worden door windmolenfunderingbouwer Sif geleverd vanuit hun productiefaciliteiten op de Tweede Maasvlakte bij Rotterdam en Roermond. Jan De Nul Group is gecontracteerd voor verschillende transport- en installatieactiviteiten voor funderingen en turbines. Inter-array kabels komen van kabelfabrikant TKF, uit de recent geopende fabriek in de Eemshaven. DEME neemt het vervoer en de installatie van de TKF inter-array kabels en Sif’s componenten voor hun rekening. De offshore netaansluiting zal worden uitgevoerd door netbeheerder TenneT. Hiervoor zullen de inter-array kabels worden aangesloten op het offshore substation van TenneT, van waaruit de exportkabels naar het hoogspanningsstation aan land in Wijk aan Zee zullen lopen.