Ontvang nu dagelijks onze kooptips!

word abonnee
IEX 25 jaar desktop iconMarkt Monitor

Energie« Terug naar discussie overzicht

Windpower - Europe

2.080 Posts
Pagina: «« 1 ... 99 100 101 102 103 104 »» | Laatste | Omlaag ↓
  1. forum rang 10 voda 7 maart 2023 07:05
    RWE to Renew 3 Wind Farms in Lower Saxony and Rhine-Westphalia

    Strategic Research Institute
    Published on :
    7 Mar, 2023, 3:30 am

    RWE has been awarded three projects in the German Federal Network Agency’s auction for onshore wind. The company will renew existing wind farms in Lower Saxony and North Rhine-Westphalia and replace them with modern turbines. This so-called repowering will almost double the installed capacity of the wind farms from 37.4MW to 73.2MW. Thanks to the new turbines with longer rotor blades, electricity production at these sites can even be almost tripled, larger rotors have a much larger harvesting area to capture wind.

    Two of the three wind farms are located in Lower Saxony: A total of 17 wind turbines in Lesse and Barbecke (Salzgitter and Peine district) with a total output of 30.6MW will be replaced by 11 turbines with a total of 61.8MW. This requires a new transformer station, which RWE plans to build in the municipality of Söhlde. Construction of both wind farms is scheduled to start in autumn. After commissioning, the projects will have the capacity to supply about 43,500 households with green electricity annually.

    In the Paderborn district, RWE is modernising its Elisenhof wind farm. The construction of the foundation for this repowering project, with a total output of 11.MW, is to take place shortly. Once commissioned, the North Rhine-Westphalian wind farm will have the capacity to generate enough green electricity to meet the needs of 5,500 households. Thanks to the new, powerful wind turbine, electricity production at this site can be more than doubled.
  2. forum rang 10 voda 8 maart 2023 06:26
    ABO Wind to Sell 5 Renewable Energy Projects to Repsol Renovables

    Strategic Research Institute
    Published on :
    8 Mar, 2023, 3:30 am

    ABO Wind has reached an agreement with Repsol Renovables for the sale of five renewable energy projects with a total capacity of 250MW. The agreement includes the further development of the five projects by ABO Wind. ABO Wind had started developing the projects in 2018 and will continue to work on them until reaching Ready to Build status. The partners have agreed to not disclose the amount and cash flow structure of the sales price.

    The projects comprise three wind farms totalling 150MW, and two solar projects with a capacity of 100MW. They are located in the province of Palencia in Northern Spain and will share interconnection infrastructures with other Repsol projects. All projects are at a very advanced stage of development and have obtained a positive Environmental Impact Statement, as well as most of the necessary permits.

    The projects are scheduled to go into operation between 2024 and 2025. When completed, the wind and solar farms will generate clean electricity to supply 172,000 homes and avoid the emission of 266,000 metric ton of CO2 each year.
  3. Willy B. 8 maart 2023 09:31
    Maandag maakte de Deense offshore windontwikkelaar Ørsted bekend dat hij een Natura 2000-vergunning heeft gekregen voor zijn Skåne offshore windproject ten zuiden van de Zweedse kust. Die werd verleend door het bestuur van de Zweedse zuidelijke provincie Skåne, dat de regering in december vorig jaar had aanbevolen het windpark goed te keuren. Het Skånepark is onderdeel van een reeks van 6 offshore windparken met een totale geplande productiecapaciteit van 18 GW.

    Voor Ørsted zijn er nu geen obstakels meer voor het verkrijgen van een overheidsvergunning voor het park. Als die er snel komt, zou het park al in 2029 stroom zou kunnen gaan leveren. De vergunning was nodig omdat het project in de nabijheid ligt van het Natura 2000-gebied in de wateren ten zuidwesten van Skåne. Van alle Ørsted-projecten in Zweden is Skånepark het verst gevorderd in het vergunningsproces. Het Deense schone energie concern ontwikkelt in totaal zes offshore-windprojecten in Zweden, waarvan er vier in januari zijn aangekondigd.

    De bijkomende projecten zullen de offshore windportfolio van de onderneming in Scandinavië uitbreiden tot 18 GW. Zij zullen naar verwachting vanaf 2032 stroom produceren. Eenmaal gebouwd zullen deze windparken genoeg stroom produceren om ruim de helft van het totale Zweedse elektriciteitsverbruik te dekken, aldus Ørsted. Twee van de nieuwe projecten, genaamd Gävle Öst en Gävle Väst, met een capaciteit van respectievelijk 5,5 GW en 4 GW komen aan de oostkust van Zweden voor de kust van de provincies Gävleborg en Uppsala. Meer naar het zuiden zit het, al eerder aangekondigde, 1,5 GW Gotland Havsvindpark ten zuidwesten van het eiland Gotland in de planning en nog meer naar het zuiden, voor de kust van de provincie Blekinge, bouwt Ørsted het 4 GW Baltic Central Havsvindpark. Het eveneens 1,5 GW Kattegatt Havsvindpark voor de westkust ter hoogte van Halmstad en Falkenberg maakt als zesde project deel uit van de portfolio.

    De offshore windenergieprojecten zijn strategisch gepland om elektriciteit daar te leveren waar die het meest nodig is. Op die manier dragen ze bij aan het verminderen van de behoefte aan dure uitbreidingen van het transmissienetwerk van noord-Zweden naar de plaatsen in het zuiden waar de elektriciteitsvraag het grootst is.
  4. forum rang 10 voda 9 maart 2023 06:27
    RWE Appoints Hobson & Porter for Grimsby Hub Construction

    Strategic Research Institute
    Published on :
    9 Mar, 2023, 3:30 am

    RWE has appointed Humber-based firm Hobson & Porter to complete the construction of its new state-of-the-art operations & maintenance facility known as the Grimsby Hub. The multi-million pound contract includes an extension to the existing Trimetric ton Knoll Offshore Wind Farm operations base located at Grimsby’s Royal Dock, and includes the creation of a new Centralised Control Room to oversee the operation of the vast majority of RWE’s UK Offshore portfolio, helping to cement Grimsby’s role as a leading location for the UK’s offshore wind sector.

    RWE announced the creation of the Grimsby Hub back in 2021, marking a major strategic commitment to the UK’s east coast. As well as Trimetric ton Knoll, RWE’s 1.4GW Sofia Offshore Wind Farm, currently under construction, will also locate its operations and maintenance activities to the new hub in the future.

    The location of the Grimsby Hub was chosen because of its proximity to existing and future projects and its deep-water quayside, which is suited to the use of Service Operations Vessels. Construction is due to commence shortly and will take around 1 year to complete. Once construction has finished, the new facility will include a joint control room offering 24/7 monitoring of multiple sites, new shared office space, and separate warehouse facilities.

    Hobson & Porter is an award-winning construction firm operating across the Yorkshire and Lincolnshire region and shares a lot of the same principles as RWE including being community focused, environmentally pro-active and they have a longstanding commitment to develop skills and training.
  5. forum rang 10 voda 9 maart 2023 06:28
    GE to Build Otada Wind Farm in Lithuania

    Strategic Research Institute
    Published on :
    9 Mar, 2023, 3:30 am

    GE Renewable Energy has been selected by Inikti as the supplier for the Otada wind farm in Lithuania, located near Sakiai city in the south west of the country. With this 18MW project, GE’s total installed onshore wind capacity in Lithuania will reach close to 500MW by the end of 2023.

    The developer and investor of the wind farm Inikti will operate four GE turbines at 5.5MW derated at 4.5MW, with a rotor diameter of 158m. All turbines will be erected on a 151m tower. The installation of the wind turbines at the project site will take place in Q3 of 2023.
  6. forum rang 10 voda 23 maart 2023 08:42
    Jera to buy Belgian offshore wind player Parkwind for EUR 1.55bn

    Jera to buy Belgian offshore wind player Parkwind for EUR 1.55bn Offshore wind turbines. Image by: Parkwind NV.

    Japanese utility Jera Co Inc said today it has agreed to acquire offshore wind player Parkwind NV from Belgian holding company Virya Energy NV for an equity value of almost EUR 1.55 billion (USD 1.67bn).

    Parkwind operates four offshore wind farms in Belgium with a combined capacity of 771 MW and is building the 257-MW Arcardis Ost project in Germany. In addition, it has a development pipeline of 4.5 GW net in Europe and elsewhere.

    The transaction is expected to close later in 2023. The parties will also discuss the option for Virya to re-invest in a minority holding in Parkwind’s Belgian wind farms, as well as a partnership on future opportunities in Belgium.

    Virya, which started assessing strategic options for Parkwind last summer, struck the deal with the Japanese buyer after a competitive sales process over the past several months.

    Jera expects the acquisition to give it a platform to grow its renewables business globally, especially in offshore wind. It will be providing complementary capabilities and financial support to help Parkwind “blossom, in a world where offshore wind will continue to play an instrumental role in facilitating the global energy decarbonisation.”

    “Parkwind is highly complementary with Jera’s offshore wind strategy and ambitions, and we look to empower Parkwind to deliver on our vision and strategy,” stated Nathalie Oosterlinck, executive officer, global head offshore wind at Jera.

    (EUR 1 = USD 1.078)

    renewablesnow.com/news/jera-to-buy-be...
  7. forum rang 10 voda 30 maart 2023 16:56
    Fors minder geld in windmolenparken: ’Energietransitie in gevaar’
    Door REDACTIE DFT

    1 uur geleden
    in FINANCIEEL

    AMSTERDAM - Ondanks de energiecrisis lopen de investeringen in windparken drastisch terug. Branchevereniging WindEurope ziet een daling tot het laagste punt in tien jaar tijd in heel Europa.

    Hoge rente en grondstoffenkosten zitten bouw windmolens dwars. Klimaatdoelen in gevaar. ANP/HH

    De uitgaven in 2022 waren met €17 miljard nog maar de helft van de bestedingen aan windparken in 2021. Hoge grondstofkosten, de oplopende rente voor financiering, een gebrek aan schepen en administratieve rompslomp bij overheden brengen het bereiken van de klimaatdoelen in gevaar, constateert de branche.

    BEKIJK OOK:
    Vertraging windmolenparken op zee door botentekort

    Grote investeerders zoals pensioenfondsen, overheden en energiebedrijven financierden bij elkaar voor slechts 10 gigawatt aan nieuwe capaciteit in de Europese Unie in 2022. Om de energiedoelen van 2030 en 2050 te kunnen halen, zou minstens 31 gigawatt per jaar aan nieuwe productie nodig zijn.

    De behoefte is groot, Europa wil ook het gat van het geweerde Russische gas en zijn olie kunnen opvangen. Vooral de complexe regelgeving zit snelle uitbreiding nu dwars, aldus directeur Giles Dickson van WindEurope. Dat vertegenwoordigt zevenhonderd bedrijven.

    BEKIJK OOK:
    Kwart meer zonnepanelen, toch minder opbrengst door grauwe winter

    Invasie
    De waarschuwing komt op het moment dat de Europese Unie vanwege de Russische oorlog in Oekraïne met groene energie wil uitbreiden, in de praktijk komt die energie voornamelijk van offshore windparken.

    De hoeveelheid zogeheten hernieuwbare energie zou, om de uitstootbeperking vast te houden, eind 2030 van 32% van het totale energieverbruik moeten zijn gestegen naar 42,5% van het totaal.

    BEKIJK OOK:
    Nederland wil in 2050 ’klimaatneutraal’: ’Technologie is er nog helemaal niet’

    Zolang de inflatie hoog blijft, en vooral de kerninflatie exclusief energiekosten, doet de rente naar verwachting hetzelfde. Dat zal de financiering van wind- en zonneparken minder laten renderen, waardoor investeringsfondsen minder toehappen, vreest WindEurope.

    De kosten voor het bouwen van een windturbine in Europa zouden de afgelopen twee jaar met meer dan 40% gegroeid, claimt WindEurope. Een oplossing is volgens de belangenvereniging een indexatie van de stijgende kosten, die deelnemers bij het uitschrijven van veilingen voor de bouw van windparken mogen berekenen.

    BEKIJK OOK:
    Windmolenbouwer investeert toch: ’Ambities wind op zee enorm’
    BEKIJK OOK:
    Eerste grote speler start met dynamische energieprijs

    www.telegraaf.nl/financieel/956990888...
  8. forum rang 10 voda 1 april 2023 08:01
    Opdrachten Vestas in Duitsland en Spanje

    Door ABM Financial News op vrijdag 31 maart 2023
    Views: 1.425

    (ABM FN-Dow Jones) Vestas heeft opdrachten binnengehaald in Duitsland en Spanje. Dit meldde de Deense brouwer van windturbines vrijdag.

    Vestas heeft van JUWA een order ontvangen voor vijf windprojecten in Duitsland van in totaal 63 MW.

    In Spanje levert Vestas 31 windturbines van in totaal 140 MW voor de windparken Cerrato, Atalayas en San Cebrián.

    Bron: ABM Financial News
  9. Willy B. 3 april 2023 10:20
    www.standaard.be/cnt/dmf20230402_9519...

    Ondanks de energiecrisis lopen de investeringen in windparken in Europa drastisch terug.

    Wereldwijd zijn er plannen voor de bouw van vele tienduizenden nieuwe windmolens de komende decennia. In België bijvoorbeeld wordt vandaag bijna 8 procent van alle energie opgewekt door windmolens. Dat percentage moet nog fors stijgen. België kondigde vorig jaar aan dat het samen met Denemarken, Duitsland en Nederland tegen 2030 vier keer zoveel windenergie wil opwekken. De gezamenlijke capaciteit van die landen zou dan 65 gigawatt (GW) bedragen, genoeg om 65 miljoen gezinnen van stroom te voorzien.

    Het probleem? Zowel in Europa als op wereldniveau twijfelt de windmolenindustrie aan de haalbaarheid van de huidige doelstellingen. Ondanks de energiecrisis lopen de investeringen in Europese windparken drastisch terug. De uitgaven in 2022 waren met 17 miljard nog maar de helft van de bestedingen aan windparken in 2021. Dat komt neer op een daling tot het laagste punt in dertien jaar. Grote investeerders zoals pensioenfondsen, overheden en energiebedrijven financierden samen slechts 10 gigawatt aan nieuwe capaciteit in de EU in 2022. Om de energiedoelen van 2030 en 2050 te kunnen halen, zou minstens 31 gigawatt per jaar aan nieuwe productie nodig zijn.

    Dure grondstoffen, de oplopende rente voor financiering, te weinig schepen en te veel administratieve rompslomp bij overheden brengen de klimaatdoelen in gevaar, meldt de sectorvereniging WindEurope in een nieuw rapport.

    In het pas verschenen jaarverslag 2022 van de Global Wind Energy Council (GWEC) staat dan weer te lezen dat zonder bijkomende maatregelen van de overheden er zowel in Europa als de VS vanaf 2025 al flessenhalzen kunnen ontstaan in de aanvoerketens van turbines en componenten. De vraag naar windmolens stijgt immers niet alleen in Europa, ook in tal van grote groeilanden en in China. Ondertussen kunnende royale subsidies via de Amerikaanse ‘Inflation Reduction Act’ leiden tot een explosie van nieuwe Amerikaanse windparken op zee. Die parken zullen grotendeels gebouwd worden met componenten afkomstig uit Europa.

    Als de overheden dan ook niet snel extra investeren in de verdere uitbouw van de aanvoerketens, bijkomende industriële capaciteit en training en vaardigheden van nieuw personeel, dreigen straks meerdere windmolenprojecten vast te lopen, waarschuwt de GWEC.

    Annemie Vermeylen, secretaris-generaal van het Belgian Offshore Platform, bevestigt bovenstaande analyse. Ook zij waarschuwt voor flessenhalzen in de toeleveringsketen en kostenverhogende effecten voor windparken op zee, onder meer door het trage beslissingsproces in België. ‘De federale regering moet eindelijk een keuze maken over het tendersysteem. Enkel zo kunnen ook in België, na meer dan zes jaar stilstand, weer investeringsbeslissingen voor offshore wind genomen worden’.
  10. forum rang 10 voda 12 april 2023 16:41
    Raad van State steunt bouw windmolens Delfzijl en Brabant, bezwaren omwonenden afgewezen
    Door THEO BESTEMAN

    Updated 1 uur geleden
    Vandaag, 10:20
    in FINANCIEEL

    AMSTERDAM - Bij Delfzijl mag energiebedrijf Eneco ondanks bezwaren van omwonenden een nieuw windpark met zestien windturbines bouwen. Ook RWE mag zijn windpark in Noord-Brabant bouwen. Dat heeft de afdeling bestuursrechtspraak van de Raad van State woensdag in een cruciale uitspraak bepaald.

    Uitspraak Raad van State betekent dat in Delfzijl een serie hoge windmolens gebouwd mag worden, waar Gedeputeerde Staten eerder al toestemming voor had gegeven. ANP/HH

    Dit oordeel van de hoogste bestuursrechter ging voor bewonersgroepen en energiebedrijven om een principiële kwestie: mogen lokale overheden in afwachting van nieuwe landelijke normen zelf eisen maken waaraan windparken voor geluid, de slagschaduw en veiligheid moeten voldoen.

    Dit is de eerste keer dat de Afdeling bestuursrechtspraak zulke gemeentelijke- en provinciale normen voor een windpark beoordeelt.

    BEKIJK OOK:
    Duitsland zet kerncentrales uit: ’Nederland zit met probleem’

    De windsector, die zit te springen om omgevingsvergunningen van overheden, keek al maanden uit naar deze uitspraak. De norm die de Raad van State stelt gaat over de vergunningen ook voor andere energiebedrijven.

    De rijksoverheid werkt aan concrete nieuwe normen specifiek voor het geluid van de turbines, slagschaduw van de windmolens en veiligheid voor de omgeving. Die normen worden dit kwartaal verwacht. Maar ze moeten nog wel eerst langs de Eerste en Tweede Kamer, wat uitstel betekent voor de al ingediende plannen.

    Geitenpaadje
    Veel overheden wachten die uitspraak overigens af. Enkele andere maakten gebruik van een geitenpaadje dat de rijksoverheid had geboden: als lokale overheden zelf duidelijke normen stellen, konden zij een vergunning afgeven aan energiebedrijven mits die aan de eisen voldeden..

    Energiebedrijf Eneco kreeg in Delfzijl in december 2021 toestemming van Gedeputeerde Staten van Groningen voor zijn windpark met zestien turbines. Die reiken tot 136 meter hoog naast het bestaande windpark Delfzijl Zuid in de gemeente Eemsdelta.

    Bezwaarmakers vonden dat de overheden veel meer onderzoek hadden moeten doen naar de geluids- en schaduwoverlast en veiligheidsrisico’s. Dat had tot strengere normen moeten leiden. Maar de Raad van State noemt het in zijn uitspraak „niet aannemelijk” dat de gemeente Eemsdelta en de provincie Groningen de veiligheidsrisico’s hebben onderschat. Strengere normen zijn niet nodig.

    Uitbreiding Brabant
    Energiebedrijf RWE wil in een andere zaak 25 jaar lang vier windmolens laten draaien in zijn windpark Karolinapolder in Noord-Brabant. Gedeputeerde Staten van Noord-Brabant verleende een omgevingsvergunning voor deze windmolens met een maximale hoogte van 215 meter per stuk in het buitengebied van de gemeente Steenbergen.

    BEKIJK OOK:
    Spanning loopt hoog op bij bouwer reuzenbatterij: keiharde strijd om aandelen

    In een reactie zegt de Nederlandse WindEnergie Associatie (NWEA) ’zeer tevreden’ te zijn. Niet alleen kunnen de projecten doorgaan, ,,de uitspraak zorgt voor perspectief voor andere windprojecten op land”, aldus de zegsman. ,,Er zijn meerdere windprojecten die wachten op een uitspraak over lokale normen.”

    www.telegraaf.nl/financieel/196941634...
  11. forum rang 10 voda 13 april 2023 07:35
    Siemens Gamesa to Supply Wind Turbines to AM Green Energy

    Siemens Gamesa, a leading renewable energy company, has signed a supply agreement with ArcelorMittal subsidiary, AM Green Energy, to provide 46 SG 3.6-145 wind turbines for a 166MW project in Andhra Pradesh, India. The wind farm is part of a larger 989MW wind-solar hybrid renewable energy project by AMGEPL in the Kurnool District of Andhra Pradesh. The deal will help AM/NS India, a steel plant located in Gujarat, meet 20% of its electricity needs from renewable resources and reduce its carbon emissions by 1.5 million metric tons annually.

    Mr. Amit Harlalka, Vice President, ArcelorMittal and CFO, AM/NS India, commented, "Our partnership with Siemens Gamesa for this benchmark model project demonstrates how establishing partnerships and collaborating across the supply chain can help us progress faster toward our decarbonization targets.”

    Siemens Gamesa will manufacture the turbines at its plants in India, and the supply will begin in the second quarter of 2023. This deal marks an important milestone for the company’s onshore 3.X platform, with order entry surpassing 1.5GW, and reinforces its competitiveness in the Indian market.

    Andhra Pradesh, where the project is located, has significant potential for power generation through wind projects. This project is in line with the state government’s Renewable Energy Export Policy 2020 for solar, wind, and hybrid projects, which aims to promote the export of renewable energy outside the state.
  12. forum rang 10 voda 13 april 2023 07:39
    EU Lags Behind in Wind Power Expansion, Ember Analysis Shows

    According to a recent analysis by Ember, the EU is lagging behind in the expansion of wind power compared to other regions of the world. While the global growth rate for wind power was 17% last year, EU countries only saw a growth rate of 9%. However, the EU still generated a higher percentage of electricity from wind and solar power in 2022 than the global average, with 22% compared to 12%. Germany was highlighted as a leader in the field, generating 32% of its electricity from wind power.

    The analysis by Ember considered data from 78 countries, which account for 93% of global electricity consumption. The report noted that the slow progress in the EU can be attributed to the complex regulatory frameworks and planning procedures that often lead to delays in the approval and construction of wind power projects.

    "The EU has the potential to lead the world in the expansion of wind power, but we need to simplify the regulatory process and make it easier for companies to invest in clean energy," said an Ember spokesperson. "We also need to prioritize the modernization of electricity grids to ensure that the power generated from wind and solar sources can be efficiently transported and distributed."

    The report also emphasized the importance of wind power expansion in the fight against climate change, noting that it is crucial for countries to increase their renewable energy capacities in order to reach their emission reduction targets.

    The EU has set a goal of achieving carbon neutrality by 2050 and increasing its share of renewable energy to 32% by 2030. While progress has been made towards these targets, the analysis by Ember suggests that more needs to be done to accelerate the expansion of wind power in the region.
  13. forum rang 10 voda 14 april 2023 10:50
    OX2 selects EEW foundations for 3.5 GW of Swedish offshore wind

    OX2 selects EEW foundations for 3.5 GW of Swedish offshore wind Yellow transition pieces for wind turbines made by EEW OSB. Image by EEW SPS.

    Swedish renewables developer OX2 AB (STO:OX2) said today it has selected German firm EEW SPC for the supply of monopile foundations for two offshore wind projects in the Baltic Sea with a targeted capacity of up to 3.5 GW.

    Under the terms of a conditional agreement that has just been signed, EEW Special Pipe Constructions GmbH & Co KG will deliver up to 230 monopile foundations for the Galatea-Galene and Triton projects respectively located off the west coast and in the south of Sweden. OX2 is developing those projects alongside Ingka Investments and the two are getting ready to start execution as soon as final permits are granted.

    According to prior announcements, Galatea-Galene and Triton are designed with power generation capacities of up to 1.7 GW and 1.4 GW, respectively.

    Emelie Zakrisson, Head of Offshore Wind Development at OX2 Sweden, commented that this conditional deal “marks the start of the next episode” for two of the company’s three Swedish offshore wind projects and that the two parties will be looking to begin construction as soon as possible. The third project, not subject to the current agreement, is called Aurora and is planned for a site between the islands Gotland and Öland.

    OX2 is meanwhile also developing offshore wind in Finland and outside Åland. Its total project portfolio amounted to 13.9 GW at the end of 2022.

    renewablesnow.com/news/ox2-selects-ee...
  14. forum rang 10 voda 15 april 2023 16:31
    Eerste turbine windmolenpark Hollandse Kust Noord staat
    Artikel van ANP Producties • 4 uur geleden
    © ANP

    ROTTERDAM (ANP) - De eerste windturbine van het nieuwe windmolenpark op zee Hollandse Kust Noord staat. Dat maakt het samenwerkingsverband van Shell en Eneco bekend. Het is de bedoeling dat het windpark voor de kust van Noord-Holland dit jaar afkomt. Dan staan er in totaal 69 windturbines.

    CrossWind, zoals het bedrijf van Eneco en Shell heet, verwacht dat het park na voltooiing jaarlijks 3,3 terawattuur aan elektriciteit kan opwekken. Dat is evenveel als 2,8 procent van alle elektriciteit die Nederland per jaar verbruikt.

    Maritiem dienstverlener Van Oord installeert de turbines samen met de windmolenfabrikant Siemens Gamesa Renewable Energy. Als de weersomstandigheden het toelaten kunnen zij met het installatieschip Scylla binnen 24 uur zo'n grote windturbine, met wieken van 97 meter lang, installeren.

    Vorig jaar kondigde het kabinet aan de capaciteit voor windenergie op zee grofweg te willen verdubbelen. Een groot deel daarvan is nodig om de industrie te helpen met verduurzamen, bijvoorbeeld voor de productie van groene waterstof. Die energiedrager moet als milieuvriendelijker alternatief voor fossiele brandstoffen in bijvoorbeeld de staalproductie dienen, maar daar is wel veel hernieuwbare elektriciteit voor nodig.

    www.msn.com/nl-nl/geldzaken/nieuws/ee...
  15. forum rang 10 voda 18 april 2023 07:01
    Nieuwe hars laat windmolenwiek smelten voor recycling
    Door THEO BESTEMAN

    Updated Gisteren, 21:26
    Gisteren, 20:15
    in FINANCIEEL

    AMSTERDAM - De eerste generaties windmolens gaan met pensioen. De oude kapotte turbinebladen werden lange tijd simpelweg begraven, het materiaal was te hard om te recyclen. Maar met klimaatafspraken als rugwind komen nieuwe generaties wieken op de markt die snel te hergebruiken zijn.

    Nieuwe serie wieken dankzij nieuw hars volledig te recyclen ANP/HH

    De velden vol windmolens op de Noordzee moeten extreme ijsvorming tot felle zonnehitte kunnen doorstaan. En dat liefst tientallen jaren lang. Nederland breidt uit en plaatst voor 21 gigawatt aan capaciteit aan windmolens offshore in enorme parken. Dat gaat in hoog tempo: vrijdag werd de eerste windmolen voor het volgende park Hollandse Kust Noord geplaatst.

    De enorme windturbinebladen, die samen een diameter van twee voetbalvelden beslaan, bestaan uit composietmaterialen zoals verharders, vooral combinaties van glasvezels en polyester en epoxy. De samenvoeging met harsen maakt ze licht, maar over de hele lengte blijven ze sterk en kunnen ze het jaren uithouden.

    BEKIJK OOK:
    Vattenfall duikt in de lente onder prijsplafond: ’Meer effect als ze ’t nu doen’

    Windturbinebladen worden soms al hergebruikt, deels voor surfplanken, kanodelen of krukken voor fysiotherapie. Maar ze eindigen ook als bermpaaltjes langs de snelweg.

    Oplosbare hars
    Vattenfall en Siemens claimen nu het volledig recyclebare blad te hebben gemaakt. „Dankzij een nieuwe hars, die bij lagere temperaturen kan worden opgelost. Daardoor wordt het gemakkelijker om de vezels te hergebruiken. Er is veel minder energie voor nodig”, zegt Eva Julius-Philipp, hoofd Milieu en Duurzaamheid Wind bij producent Siemens Gamesa. Waar iedereen probeert zijn CO2-uitstoot te beperken, is iedere graad minder verhitting al milieuwinst. De nieuwe molens met drie bladen van gezamenlijk 129 ton staan er nu drie weken.

    BEKIJK OOK:
    Schrik na knakken enorme windmolen: ’Brokstukken hadden op grote weg kunnen komen’

    Het opslaan van rotorblad in de grond is Europese overheden een doorn in het oog. Volgens brancheorganisatie WindEurope is het bij hoge uitzondering nog toegestaan. Maar er is een hele Nederlandse bedrijfstak ontstaan van ondernemers die testen hoe ze er ski’s of frames van zonnepanelen van kunnen maken. Tot recyclemachines die van de honderden meters blad kleine bolletjes proberen te fabriceren. Direct als grondstof voor andere producten lukt dat nog niet op grote schaal. Het gas dat vrijkomt wordt meestal wel hergebruikt.

    Rendement verhogen
    „We proberen nieuwe bladen en installaties nu zo te maken dat ze volledig uit elkaar te halen zijn. Je ontwerpt ze al met het oog op hergebruik”, aldus Julius-Philipp. Zo is er een consortium van bedrijven ontstaan die per onderdeel kijken hoe ze het beste te recyclen zijn. „Het gaat inmiddels veel verder dan de bladen alleen. Iedereen kijkt hoe ze het rendement van recyclen van alle onderdelen kunnen vergroten.”

    Turbines moeten steeds meer standaard worden voor snel hergebruik magneten, kabels en bladen. ANP/HH

    De bladen met het nieuwe hars en de standaard demontage zorgen voor een beperking van de uitstoot met 28% vergeleken met de oude methode, zo claimen de bedrijven. Voor een windpark op zee gaat het dan om enorme hoeveelheden materiaal, aldus Julius-Philipp. Tegen 2025 willen Vattenfall en Siemens dat de helft van alle bladen gerecycled wordt.

    „Het ontwerpen van de bladen verschilt per bedrijven, maar iedereen is zich er nu van bewust dat we het efficiënt moeten doen om die uitstoot te beperken”, stelt zij. Intern was er wel al zekerheid dat de bladen met de nieuwe hars sterk genoeg waren en zo beter hergebruikt kunnen worden. „Maar het moet ook in de praktijk werken. Dat is nu gebleken.” Ook concurrent Vestas is bezig met een eigen procedé om bladen te laten ontbinden voor hergebruik.

    Voorsprong
    Recyclen gebeurt allereerst met windturbinebladen die op land gedemonteerd worden. Op zee is dat op enorme hoogte nog complex. „Maar ook die techniek verbetert snel”, zegt Julius-Philipp.

    In de sector wordt gezien dat Siemens en Vattenfall hebben momenteel een voorsprong hebben. Jan Vos van de Nederlandse Wind- en Energieassociatie (NWEA), de brancheclub: „De turbines en bladen zijn volledig uit elkaar te halen. Het is een volgende stap, die op de Noordzee in verschillende vormen wordt getest.”

    BEKIJK OOK:
    Massaclaim tegen energiebedrijven om hoge tarieven: ’in strijd met de wet’

    De Nederlandse bedrijven proberen samen tot een enkele standaard voor productie te komen. „Zodat ze allemaal op dezelfde manier uit elkaar gehaald kunnen worden”, aldus Vos. Op land, zee en in de fabriek zal het hergebruik veel meer standaard worden, zo vat hij de consensus onder de leden samen. „Die bladen worden zó groot, je moet dat met elkaar afstemmen als je meer wilt gaan hergebruiken op veel grotere schaal komende jaren.” De hoop is dat Europa een zelfde standaard kan gebruiken.

    Vos van de Nederlandse Wind- en Energieassociatie kijkt verder vooruit. „Een magneet in zo’n aandrijfturbine heeft veel aardmetalen. Het zou fantastisch zijn als die straks ook op dezelfde manier uit elkaar wordt gehaald, en je een standaard stroom van grondstoffen kunt aanbieden voor hergebruik.”

    www.telegraaf.nl/financieel/854273161...
  16. forum rang 10 voda 24 april 2023 06:52
    Nieuwe onderzeese stroomkabel koppelt Nederlands windpark aan Verenigd Koninkrijk

    Er komt een nieuwe elektriciteitsverbinding tussen Nederland en het Verenigd Koninkrijk, waaraan voor het eerst ook een Nederlands offshorewindpark direct wordt gekoppeld. De onderzeese kabel, LionLink, met een lengte van circa 250 kilometer zal rond 2030 2 miljoen huishoudens van stroom kunnen voorzien.

    Economieredactie 24-04-23, 01:24

    Dat zullen minister Rob Jetten (Klimaat en Energie) en zijn Britse collega Grant Shapps op een Noordzeetop in het Belgische Oostende maandagmiddag aankondigen.

    De nieuwe gelijkstroomkabel wordt ontwikkeld door landelijk netbeheerder TenneT en het Britse National Grid. ,,De Noordzee wordt de grootste leverancier van groene elektriciteit voor Nederland en grote delen van Europa’’, zegt minister Jetten. ,,Nauwe samenwerking bij windenergie op zee en onderlinge verbindingen tussen Noordzeelanden zijn daarbij essentieel.’’

    LionLink kan volgens de bewindsman bijna 2 gigawatt aan elektriciteit leveren aan beide landen, “genoeg om 2 miljoen huishoudens van stroom te voorzien”. De nieuwe verbinding is ook bedoeld om de CO2-uitstoot te verminderen, verhoogt de energie-onafhankelijkheid in Europa en vergroot leveringszekerheid.

    ,,Als er bijvoorbeeld een overschot aan windenergie is, kan dit onmiddellijk gedeeld worden met landen met een stroomtekort, en vice versa’’, aldus Jetten. Het koppelen van windparken op zee via de eerste grensoverschrijdende gelijkstroomkabel van deze omvang is een nieuwe stap naar een geïntegreerd netwerk in de Noordzee.

    Nederland zal in 2030 circa 21 gigawatt aan windenergie op zee hebben gerealiseerd en onderzoekt of 50 GW in 2040 en 72 GW in 2050 haalbaar zijn, ook gezien de fysieke ruimte en ecologische impact.

    www.ad.nl/economie/nieuwe-onderzeese-...
  17. forum rang 10 voda 5 mei 2023 16:37
    TenneT investeert 5,5 miljard euro in kabels voor windenergie
    Artikel van ANP Producties • 5 uur geleden
    © ANP

    ARNHEM (ANP) - Hoogspanningsnetbeheerder TenneT heeft voor 5,5 miljard euro aan overeenkomsten gesloten met andere bedrijven voor de aanleg van tien hoogspanningskabels. Het gaat om zes Duitse aansluitingen met windparken op zee en drie in Nederland. Naast de kabels op zee gaat het ook om de aanleg van een zogeheten gelijkstroomcorridor, die alle op zee opgewekte elektriciteit verder landinwaarts moet vervoeren.

    TenneT heeft voor de klussen overeenkomsten gesloten met het Deense industrieconcern NKT, het Franse kabelbedrijf Nexans en een samenwerkingsverband van het Belgische maritieme bedrijf Jan de Nul met het Zoetermeerse ingenieursbureau Denys en LS Cable & System uit Zuid-Korea. Zij zullen zich onder andere bezighouden met het ontwerp van de kabels, de productie, de installatie en de uiteindelijke verbinding.

    De aansluitingen tussen zee en land zullen waarschijnlijk in 2031 klaar zijn. Maar het consortium van Jan de Nul werkt ook aan een deel van de zogeheten NordOstlink, een geheel aan kabels dat windenergie van de Duitse deelstaat Sleeswijk-Holstein verder naar het oosten vervoert. Dat werk is naar verwachting in 2032 klaar. Alle projecten bij elkaar zijn volgens TenneT goed voor zo'n zevenduizend kilometer aan hoogspanningskabels.

    Voor de overgang naar schonere energiebronnen zijn forse investeringen nodig. TenneT geeft daarom tientallen miljarden euro's uit voor bijvoorbeeld de verbindingen tussen windparken op zee en het land. Maar doordat bedrijven en huishoudens overstappen op elektriciteit, moeten netbeheerders ook veel geld uitgeven aan de uitbreiding en verzwaring van het stroomnet.
  18. forum rang 10 voda 8 mei 2023 09:06
    Doel windenergie op land gehaald, wel minder projecten op komst
    Artikel van ANP Producties • 8 uur geleden
    © ANP

    DEN HAAG (ANP) - De hoeveelheid windenergie op land is afgelopen jaar opnieuw gegroeid, waardoor is voldaan aan een landelijke doelstelling. Eind vorig jaar was er volgens een jaarlijks onderzoek van de Rijksdienst voor Ondernemend Nederland (RVO) 6045 megawatt aan windvermogen op land. Eigenlijk had er in 2020 al minimaal 6000 megawatt aan vermogen moeten zijn, maar dat doel uit het Energieakkoord van 2013 bleek onhaalbaar en werd uitgesteld.

    De RVO waarschuwt wel over de vooruitzichten voor de komende jaren. De Raad van State oordeelde in 2021 dat er andere milieubeoordelingen nodig zijn voor de bouw van windturbines. "Door de onzekerheid over nieuwe normen en de consequenties hiervan zijn het afgelopen jaar nauwelijks nieuwe windprojecten vergund", stelt de RVO. "Er zijn weinig nieuwe projecten in beeld, waardoor het aantal projecten in de pijplijn van windenergie op land nauwelijks toeneemt." Dit jaar komt er naar verwachting wel nog 835 megawatt windenergie op land bij.

    Het nieuwe doel, uit het Klimaatakkoord, is om in 2030 minimaal 35 terawattuur aan duurzame elektriciteit op te wekken met grootschalige zonne- en windenergieprojecten op land. Volgens de RVO staat het windvermogen van eind vorig jaar gelijk aan 17,9 terawattuur bij een gemiddeld windjaar.
  19. forum rang 10 voda 8 juni 2023 06:30
    Race naar top windturbines: ’Maximaal bereik 300 meter hoog’
    Door THEO BESTEMAN

    Updated Vandaag, 01:31
    Gisteren, 21:05
    in FINANCIEEL

    AMSTERDAM - Windturbines op zee worden steeds groter, soms voetbalvelden lang. Hoe groter, hoe krachtiger met meer energieopbrengst, is de gedachte. Maar de Nederlandse windturbinesector zelf wil een maximum: de hele installatie zou tot driehonderd meter hoog mogen reiken.

    Race naar de top, een maximum van 1000 voet of 305 meter is gewenst, bepleit de windbranche nu zelf. GETTY IMAGES

    Een maximum stellen aan deze ’tiphoogte’ en dus de lengte van de enorme vleugels voor windparken op zee maakt dat fabrikanten ze in vaste maten kunnen produceren, stelt Jan Vos, voorzitter van de branche, de Nederlandse WindEnergie Associatie (NWEA).

    Die standaard noemt hij nodig, omdat de politiek een ambitieuze stip aan de horizon heeft gezet: rond 2030 moeten bestaande en duizenden nieuwe windmolens op zee ongeveer 21 gigawatt aan energie gaan leveren. Dat is zo’n 75% van het huidige elektriciteitsverbruik van Nederland. Voor zware kabels van de turbines richting die windparken is €16 miljard investering nodig, aldus het kabinet.

    BEKIJK OOK:
    Vertraging windmolenparken op zee door botentekort

    „Om die groei van windmolens op zee bij te kunnen benen, moet er een grens worden vastgesteld. Standaardnormen zullen zorgen voor snellere installatie”, aldus Vos. Op de Maasvlakte in Rotterdam staat de Haliade-X windturbine, die volgens producent General Electric (GE) met 260 meter nu tot grootste wereldwijd wordt gerekend.

    Maximum
    Op zee zouden ze binnen veiligheidsgrenzen nog hoger kunnen worden. Onder de grootste producenten Vestas, Siemens Gamesa, GE, Goldwind en Envision is een race ontbrand voor telkens nog grotere vleugels.

    BEKIJK OOK:
    Raad van State steunt bouw windmolens Delfzijl en Brabant, bezwaren omwonenden afgewezen

    Een maximumnorm geeft de producenten in deze snel veranderde sector zekerheid, stelt Vos van NWEA. Een nog grotere windmolen wekt wel meer energie op, maar voor de producenten „is het een enorme uitdaging om de constante groei van productsoorten bij te benen”, aldus Vos.

    „Op het moment van levering is de bestelling alweer achterhaald. Zo lopen we steeds vaker achter de feiten aan. Dat is zonde van tijd en geld. Het komt nu nog voor dat aannemers een installatieschip bestellen, maar op het moment van levering merken dat dat schip alweer te klein is.”

    Met een standaardnorm „zullen kosten lager zijn”, zo bepleit Vos bij de Nederlandse overheid en de Europese Unie. De branche komt als wens uit op een internationale norm van 1000 voet, omgerekend welgeteld 305 meter, tot waar de turbinevleugels hoog mogen reiken.

    Minimum 25 meter
    Aan de onderkant, tussen het wateroppervlak en de draaiende bladen, zou er 25 meter over moeten blijven als minimum, „zowel vanuit veiligheidsoogpunt als vanuit de impact op vogels.”

    BEKIJK OOK:
    ’Voorrang windenergie brengt ons in problemen’

    Per molenfundering betekent dat zo’n 14 megawatt aan vermogen, volgens de producenten genoeg om 16.000 huishoudens van energie te kunnen voorzien.

    De nieuwste generatie installatieschepen kan de voetbalvelden grote turbinebladen al wel verwerken en plaatsen. Investeringen in nóg weer grotere generaties installaties en bijbehorende schepen is overbodig, aldus Vos.

    BEKIJK OOK:
    Windparken op zee stranden op hogere kosten en prijsplafonds
    BEKIJK OOK:
    Column: pijlen gericht op snel terugdringen energieverbruik
    BEKIJK OOK:
    België wil turbines in natuurgebieden: vissers zien kans op extra ruimte voor kotters

    www.telegraaf.nl/financieel/190001561...
  20. Joni-2 8 juni 2023 08:40
    Reuters
    Orsted investeert tegen 2030 68 miljard dollar in hernieuwbare energie
    08 juni 2023 — 02:00 uur EDT

    Geschreven door Terje Solsvik voor Reuters ->

    OSLO, 8 juni (Reuters) - Hernieuwbare energiegroep Orsted ORSTED.CO zei woensdag laat dat het tegen 2030 475 miljard Deense kronen ($ 68,3 miljard) zal investeren om zijn doel te bereiken om aan het eind 50 gigawatt (GW) geïnstalleerd vermogen te hebben van het decennium.

    Het Deense bedrijf zei dat de plannen "volledig uit eigen middelen gefinancierd" waren en dat het verwachtte beter te presteren dan de doelstellingen die in 2021 waren vastgesteld voor inkomsten vóór rente, belastingen, afschrijvingen en amortisatie (EBITDA) en voor rendement op geïnvesteerd vermogen (ROCE).

    "We liggen op schema om onze eerdere EBITDA- en ROCE-doelstellingen voor 2020-2027 te overtreffen, wat de significante waarde in onze portefeuille van hernieuwbare projecten bevestigt", zei Chief Executive Mads Nipper in een verklaring.

    Orsted, 's werelds nummer 1 ontwikkelaar van offshore windmolenparken, exploiteert momenteel 15,5 GW aan activa voor hernieuwbare energie, terwijl een capaciteit van 4,9 GW in aanbouw is en projecten die nog eens 10,6 GW vertegenwoordigen, zijn gegund, aldus het bedrijf.

    ($ 1 = 6,9523 Deense kronen)

    (Rapportage door Terje Solsvik, bewerking door Essi Lehto)

    (( jacob.pedersen@thomsonreuters.com ; Twitter: @JacobGronholt;))
2.080 Posts
Pagina: «« 1 ... 99 100 101 102 103 104 »» | Laatste |Omhoog ↑

Meedoen aan de discussie?

Word nu gratis lid of log in met je emailadres en wachtwoord.