Ontvang nu dagelijks onze kooptips!

word abonnee
IEX 25 jaar desktop iconMarkt Monitor

Aandeel Fugro AEX:FUR.NL, NL00150003E1

Laatste koers (eur) Verschil Volume
16,130   +0,020   (+0,12%) Dagrange 16,000 - 16,400 431.163   Gem. (3M) 336,8K

Fugro - vierde kwartaal 2017

1.345 Posts
Pagina: «« 1 ... 57 58 59 60 61 ... 68 »» | Laatste | Omlaag ↓
  1. [verwijderd] 8 december 2017 11:36
    6 dec: Arrowstreet Capital verkleint shortpositie in Fugro van 0.78% naar 0.69% shortsell.nl/short/Fugro #Fugro

    6 dec: AHL Partners verkleint shortpositie in Fugro van 1.15% naar 1.08% shortsell.nl/short/Fugro #Fugro

    6 dec: Marshall Wace meldt een shortpositie in Fugro van 0.5% (laatst bekende positie: 0.45%) shortsell.nl/short/Fugro #Fugro

    6 dec: HBK Investments vergroot shortpositie in Fugro van 1.79% naar 1.82% shortsell.nl/short/Fugro #Fugro #short
  2. forum rang 6 IQ 11 december 2017 22:35
    Olieprijs in 2018 boven de 75€ in de voorspellingen, kan niet anders dan dat Fugro het aandeel wordt van 2018, heb al confetti en slingers gekocht om een feestje te vieren, geloof in die voorspelling, maar geef toe dat ik iets partijdig ben, heb aandelen Fugro dus is mijn uitlating beïnvloed door geldzucht en dat maakt een mens ongeloofwaardig.

    Handel in aandelen is altijd risicovol.
  3. forum rang 4 torro 14 december 2017 15:43

    BAVA stemt in met aanstelling Oyestein Loseth.
    (ABM FN-Dow Jones) Aandeelhouders van Fugro hebben ingestemd met de benoeming van Oyestein Loseth tot nieuwe topman. Dit maakte de bodemonderzoeker donderdagmiddag bekend na afloop van een buitengewone aandeelhoudersvergadering.
    Loseth treedt toe tot de raad van bestuur met ingang van 1 januari 2018. Hij volgt Paul van Riel op die terugtreedt als CEO bij de jaarlijkse aandeelhoudersvergadering op 26 april.
    Tijdens de Bava werd woensdag ook goedkeuring verleend aan het verhogen van het aantal gewone aandelen, terwijl het aantal preferente aandelen afneemt.
    Op een rode beurs verloor het aandeel Fugro donderdagmiddag 0,6 procent tot 11,95 euro.
    Door: ABM Financial News.
  4. [verwijderd] 14 december 2017 16:25
    quote:

    torro schreef op 14 december 2017 15:43:

    BAVA stemt in met aanstelling Oyestein Loseth.
    (ABM FN-Dow Jones) Aandeelhouders van Fugro hebben ingestemd met de benoeming van Oyestein Loseth tot nieuwe topman. Dit maakte de bodemonderzoeker donderdagmiddag bekend na afloop van een buitengewone aandeelhoudersvergadering.
    Loseth treedt toe tot de raad van bestuur met ingang van 1 januari 2018. Hij volgt Paul van Riel op die terugtreedt als CEO bij de jaarlijkse aandeelhoudersvergadering op 26 april.
    Tijdens de Bava werd woensdag ook goedkeuring verleend aan het verhogen van het aantal gewone aandelen, terwijl het aantal preferente aandelen afneemt.
    Op een rode beurs verloor het aandeel Fugro donderdagmiddag 0,6 procent tot 11,95 euro.
    Door: ABM Financial News.

    Mooi, laat die nieuwe zich maar alvast inwerken.... en orde op zaken stellen. #GoFugroGo
  5. [verwijderd] 15 december 2017 11:55
    Fugro Set for Triton Knoll Site Survey

    Innogy’s Triton Knoll offshore wind farm is set to begin its most extensive offshore programme of works to date with Fugro’s UK-based marine site characterisation group taking the helm.

    The team of technical specialists at Fugro GB Marine will lead a programme of seabed and sub-seafloor investigations on behalf of Triton Knoll, with three vessels operating out of the Humber.

    Another local firm, PMSL, will also provide guard vessel services for the duration of the works, ensuring the survey areas remain safe and clear at all times.

    It’s the first major offshore activity for the 860MW project since its successful bid into the Government’s latest Contract for Difference (CfD) auction in September and after innogy acquired former partner Statkraft’s shares in the wind farm to become sole owner.

    Andy Barwise, Triton Knoll principal geotechnical engineer, said: “We’re delighted to be taking our first steps into UK waters so soon after our successful CfD bid, and very pleased to have Fugro at helm of this important stage of the project.

    “This programme of site investigations will aid our detailed design work, and marks a critical stage in our preparations for offshore construction, currently expected to begin in 2020. These site investigations will be key to the production and installation of the 90 monopile foundations, currently being designed by UK firm Atkins on behalf of main contractor Smulders Sif Steel Foundations JV , and which will support the most powerful and efficient wind turbines currently on the market.”

    Triton Knoll is now entering an exciting phase, with a CfD secured and all of its preferred suppliers on board and collaborating towards the delivery of the project’s business plan.

    Under a circa £3-million contract, Fugro will operate three vessels out of the Humber, supported by technical teams from the company’s Wallingford headquarters. The full package of geophysical and geotechnical investigations will involve the mapping and testing of the seafloor and sub-seafloor conditions and borehole testing to a depth of up to 50 metres, at the locations of all 90 turbines and 2 offshore substations. It will also look at conditions around the export and inter-array cable locations.

    Tony Hodgson, Fugro’s global product manager for Renewables, said: “We are pleased to be involved in this strategically important project. Our delivery of accurate, reliable data will not only support innogy’s decisions in the development process but will help to ensure the long-term, safe operational performance of this facility.”

    Triton Knoll is an innogy-owned offshore wind farm, and has a planned installed capacity of 860MW capable of supplying the equivalent of over 800,000 UK households per year, with renewable electricity.

    The project was awarded a Contract For Difference in September 2017, and expects to trigger a capital expenditure investment of around £2billion into much needed UK energy infrastructure. This will enable the delivery of some of the lowest cost energy generation for UK consumers.

    It is now progressing towards a financial investment decision likely in 2018 with full onshore construction starting shortly after, and offshore construction starting in 2020. First energy generation could be as early as mid-Q1 2021, with the project expecting to begin commissioning in 2021.

    Bron: Subsea World News, 12 december 2017

    subseaworldnews.com/2017/12/12/fugro-...
1.345 Posts
Pagina: «« 1 ... 57 58 59 60 61 ... 68 »» | Laatste |Omhoog ↑

Meedoen aan de discussie?

Word nu gratis lid of log in met je emailadres en wachtwoord.